Projects | Hospitality and Residential

Our diverse experience in this field began in the 1980’s as the international tourist and business boom gave rise to demand for independent high end hotels complete with business conference centers, banquet halls, restaurants and shopping areas. By 2010, Reliance had completed over 750 hotel rooms and associated conference spaces. As the market evolved and baby boomers turned into empty nesters, high rise condominium construction became more common. Our vast experience in this domain ranges from affordable residential units for first-time buyers to condominium developments for seasoned buyers, complete with high-end amenities. In 2009, the Canadian housing market emerged from the recession and by 2010, Reliance had completed or had under construction over 3,000 condo units in eastern Canada.

Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6
»
Brimley Road Under construction  |  1,219,282
Contract delivery :
Owned by Oxford Properties Group, and designed by Quadrangle Architects, Brimley Road will include approximately 1.2 million sq.ft. in three towers of 32, 41 and 50 storeys. Situated over 2 to 7 storey podiums and bisected by a 22,000 sq.ft. publicly accessible open space, the project is serviced by 2 levels of contiguous underground parking. The project involves the straightening of Borough Drive, a municipal road, which will require a land swap between the City and the Owner.

Delta Mont Saint-Anne Under construction  |  35,000 sf
Contract delivery :
The 30,000 sq.ft. renovation of the hotel’s public area will include a brand-new façade and canopy as well as the expansion of the exising aquatic center including an SPA and Nordic baths totalling 15,000 sq.ft.. Aside from the beautiful tall ceilings and fireplace at the lobby, the public space will host artwork by local artists, one of which is a very large decorative leaf that will hang over the reception area.The renovations are scheduled to be completed in September of 2021.
Central Parc Laval 3 Under construction  |  256,870
Contract delivery :
Central Parc Laval R3 is the third phase of the Central Parc Laval development. This 3rd tower, known as R3, is comprised of 15 residential floors plus a PH level, as well as two levels of underground parking. Featuring a large amenity space including a cinema, a golf simulator, games room (foosball and billiards) and gym, the building is a concrete structure clad in aluminum paneling with logia balconies. This building includes 149 rental apartment units ranging from approximately 610 sq.ft. to 1,600 sq.ft. Featuring 4 rounded corners, the very large windows give multiple vantage points for 40% of the units. The owner’s have committed to reducing the carbon footprint of this tower by 17% as compared to the first phase.

201 Rideau Under construction  |  183,000
Contract delivery :
The 201 Rideau building is located in the historic Ottawa Market district. This facility is a 25 storey, 183,031 sq.ft. building with both hotel and residential units, and 4 floors underground parking. The AC Marriott has the first 17 floors consisting of 208 suites with amenities such as pool, lounge, restaurant and conference rooms. The residential suites consist of the top 8 floors totaling 95 residential suites and independent elevators from parking to residential suites.
75 Slater Under construction  |  160,000
Contract delivery :
Construction Management
The 75 Slater project is a 25 storey condominium tower built in the Ottawa downtown core of the business district. The project consists of 194 suites, and a 2 floor parking garage. With a mixture of window wall and precast envelope, the building spans over 159,862 sq. ft. The upper floor features a beautiful terrace that overlooks the downtown façade. Amenities include items such as bowling lanes and a dinning room.



4469 Ste-Catherine Under construction  |  17,872
Contract delivery :
Construction Management
The project at 4469 Ste-Catherine St. West is a development of a 5-storey rental building, complete with an underground parking garage. The frontage of the building is made of Quebec St. Marc stone with artisan zinc sloping roof panels. The building is replacing a vacant lot between two existing buildings at the corner of Ste-Catherine St., and Metcalfe St.

Le Se7t Under construction  |  100,000 sq.ft.
Contract delivery :
Construction Management
Le SE7T Phase II in Griffintown is designed to offer the best of Montreal's urban lifestyle and consists of 109 condos over 7 storeys, hence its name. Situated near the Lachine Canal bikeway and a few blocks away from the Atwater market, Le Sep7t will be equipped with all trendy aspects of living in Montreal’s vital downtown neighbourhood. This encompasses street level restaurants, cafés and terraces, and the building itself will include a fitness facility, an outdoor pool, bicycle racks, and so much more.

Voltige Belvedere Under construction  |  320,200 sq.ft
Contract delivery :
Construction Management
Voltige Belvedere, the second phase of a new residential development in Montreal will consist of 217 rental units over 16 floors. The building is within the pleasant neighbourhood of Ahuntsic-Cartierville, surrounded by a train station and several shopping malls, and close to many cultural centres and sports complexes. Thanks to its centrality, residents can reach the downtown area in just 15 minutes, as well as the popular neighbourhoods of Mount Royal and Outremont. In terms of its unique architecture, the building’s design was conceived to illuminate the units with natural daylight, and features a balcony in every unit.

Seasons Under construction  |  926,000 sq.ft.
Contract delivery :
Construction Management
Seasons, a twin tower family oriented development in North York, developed by Concord Pacific Group, is valued at $200 million, includes a 39 and a 42 storey tower, 926,000 sf of construction, 694 suites and townhouses, and luxurious amenities such an outdoor skating rink, lush landscaping, 4 levels of underground parking and a 2 storey podium.

The Seasons project is a continuation and evolution of the Park Place development located in North York where a new destination for family living has been created. This project continues the tradition of extensive amenities as part of the project, in addition to lush green spaces, and a park area, and features 4 floors of underground parking, and a 2 floor podium. The suites include luxurious bathrooms, high-end European appliances and functional kitchens.

Canada House Under construction  |  1,300,000 sq.ft.
Contract delivery :
Construction Management
These iconic super high-rise twin towers, called Canada House, located next to the Rogers Center, and developed by Concord Pacific Group, are valued at over $400 million, includes an 80 and a 70 storey tower, totaling over 1,300,000 sf of construction, 1,397 units, luxurious amenities such as touchless car wash facilities, 6 levels of underground parking and a 12 storey podium.

Canada House's design is a tribute to all that is Canadian. Included in the façade are specifically designed lights and colored panels, that once illuminated, take the shape of the Canadian Maple Leaf. Additionally, an exterior "lake" for canoeing, echoing Canada's vast rivers, transforms into a skating rink in the winter. The suites include oversize tiled bathrooms, fully decked balconies, complete with infrared heaters, similar to the ones found on restaurant terraces across Canada, custom doors and frames, and Miele's newest technological achievement - ductless dryers.

«
1 - 2 - 3 - 4 - 5 - 6
»