Labelle Tower Under construction  |  134,260 sq.ft.
Contract delivery :
This new project includes the construction of a 4 story, 78 units, rental building, and 1 story of underground parking. The building is on a large lot where there is an operating Hampton Inn. The units range from 600 sq.ft. to 1,400 sq.ft. and the construction involves maintaining an existing outdoor pool which sits 5 feet from the new garage foundation wall. The project is 134,260 sq.ft. of gross constructed area.
Lonsdale Under contruction  |  306,137 sq.ft.
Contract delivery :
The 2Fifteen Lonsdale Project is a 20 storey ultra luxury rental apartment in Toronto’s Forest Hill Neighbourhood. The project consists of 177 suites and a 3 1/2 level parking garage. The building envelope is a mixture of curtain wall, window wall and Petersen Tegl Kolumba handmade brick from Denmark. All of the exposed aluminum on the project including windows, railings, panelling is bronze anodized. The building features and amenities include spa and fitness facility on Ground Floor, a 17th floor rooftop terrace facing the south and overlooking the city, custom kitchens, luxury appliances, wide plank engineered hardwood flooring and walk-in closets.
Symphonia VIU Under construction  |  550,000 sq.ft
Contract delivery :
Expansion of the phase 2A project comprising 46 floors including 2 floors of underground parking. The podium and garage totalize 68,000 square feet and each typical floor of the tower will be 9,000 square feet. The curtain wall envelope, the exterior fittings,the interior finishes of the condos including high-end engineering flooring, Miele and Bosch appliances, and Eruopean style doors, as well as the common areas including an interior pool, a sauna and a gym, all confirm the high-end status of this project.
2100 Rememberance Under construction  |  185,000 sq.ft.
Contract delivery :
Construction Management
The project 2100 Remembrance near the heart of the city center of Lachine includes 139 units with one floor below grade and 7 floors above grade. Additionally, the project includes 14 2-storey townhouses on the ground floor. The overall area of the building is 185,000 square feet.
Marche Central Under Construction  |  1,000,000 sq.ft.
Contract delivery :
Construction Management
Demolition and construction for a new commercial retail center of approximately 1,000,000 sq.ft., including civil hardscape and urban spaces beginning in fall 2021. The first phase consists of the construction of new 210,000 sq.ft. commercial building, for two (2) new retail stores, complete with an 180,000 sq.ft. greenhouse roof. Project delivery is scheduled for the fall 2022.
Airlie Under construction  |  115,000 sq.ft.
Contract delivery :
Construction Management
9160 Airlie is a 115,000 sq.ft.residential building in Lasalle which features amenities such as a gym and a conference room. This project includes 75 units with 1 floor below grade. It is a 4 floors high low rise building with a mezzanine. Included are 26 2-storey penthouse suites. Additiionally, a large retail component of approximately 15,000 square feet has already been leased to a CPE daycare center. The envelope consists of windows and brick masonry with some aluminum panels and metal siding.
Le Charlebois Under construction  |  52,150 sq.ft.
Contract delivery :
Construction Management
This project is a luxury condominium building built on the former Pioneer site, in the heart of Pointe-Claire village. It is a 3 stories new construction of 52,150 square feet of gross constructed area including 1 storey of underground parking. There will be 14 unique condo units and 4 commercial spaces on the ground floor. The building takes up the entire site, and there are power lines along 3 sides of the site.
Tequila 2021  |  35,475 sq.ft.
Contract delivery :
Construction Management
The Tesla dealership in Saint-Bruno-de-Montarville stands out with its design focused on assembly-line work and its various service stations. The dealership has 8 V3 superchargers. This type of charger is able to charge a car to 80% in just 30 minutes while the version before - the V2 Supercharger - could charge a car to 80% in 75 minutes.An electric car service center is completely different from a gasoline car service center. The vehicle's power supply influences the type of ventilation system - since electric cars do not use gasoline, systems for removing CO2 are not necessary in such a garage.
CanadaWide Under Construction  |  150,000 sq.ft.
Contract delivery :
Conversion of an existing (circa 1968) bulk storage warehouse facility to a modernized refrigerated / freezer distribution center complete with exterior facades being re-built to meet the requirements of a refrigerated environment and upgrades to shipping / receiving activities. The exterior truck parking / loading dock facilities are being fully revamped to suit the conversion from a stagnant warehouse facility to a modern an effective shipping / receiving operation. The project includes the full removal and replacement of the rear building structure and foundation to suit the revised vocation of the building. The existing roofing system is being replaced to meet the new needs of the facility whih include a complete refrigeration system for the entire 150,000 square feet of the distribution center.

Brimley Road Pre-construction  |  1,219,282 sq.ft.
Contract delivery :
Owned by Oxford Properties Group, and designed by Quadrangle Architects, Brimley Road will include approximately 1.2 million sq.ft. in three towers of 32, 41, and 50 storeys. Situated over 2 to 7 storey podiums and bisected by a 22,000 square feet publicly accessible open space. The project is serviced by 2 levels of contiguous underground parking and involves the straightening of Borough Drive, a municipal road, which will require a land swap between the city and the owner.

«