Projects | Industrial Buildings

We build warehouses, distribution centers, cold storage facilities, transportation/logistics facilities, heavy industry factories and foundries for a variety of industrial clients, ranging from manufacturers of consumer products through to metals recyclers. The volume of industrial construction we do – amounting to some two hundred buildings over the past decade and generating over two million square feet of new industrial space every year – places Reliance among the top contractors in North America in this market.

Recently, given the scarcity of new land in developing metropolises and the constant increasing volume of imports from the far east, the redevelopment and modernization of existing industrial facilities and brown sites to today’s marketable standards, has become a niche market in which we have excelled.

Sort by:year square footage
«
1 - 2 - 3 - 4 - 5
»
Caledon 2022  |  130 acres
Contract delivery :
Tribal Partners purchased a piece of land which is 130 acres for industrial development. A stream runs through the property and had to be relocated for future development. Reliance was selected by Tribal to construct a new channel and complete the geomorphology of the work.
Private Jet Hangar -- Whitewind 2000  |  35,000 sf
Contract delivery :
The design and construction of this private jet hanger completed by Reliance is capable of fitting two Global Express aircraft or one larger Boeing aircraft. Fire suppression requirements mandated the construction of an independent 250,000 US gallon underfloor storage water reservoir. Clearance for airplanes required a 50'-0" high clear steel structure and a 150'-0" by 45'-0" high motorized door complete with heated tracks and heated exterior concrete apron.
Browns Under construction  |  38,000 sq.ft.
Contract delivery :
Expansion of the Browns Shoes warehouse of 38,000 sq.ft. with a clear height of 40’. 3 unloading docks and 1 drive-in door are added to the existing building and the floors will offer a level of flatness of FF45 in order to accommodate storage at height. The project requires 65 new wheelbases in the warehouse in order to accommodate new mezzanines on 2 new floors for storage and the development of new offices.
McAuslan Brewery 2002  |  41,000 sf
Contract delivery :
Design Build, Fixed Price
Work began with site decontamination in accordance with environmental laws, and extensive water treatment system for water using in brewing process. Installation of underground sedimentation tanks, piping and treatment tanks was done underground in order to allow space for large fermentation tanks sitting on a thickened reinforced slabs on grade;up to 24" in some areas.
Avmor 2000  |  72,000 sf
Contract delivery :
A72,000 sf extension to existing building including 30,000 sf of head office fit-up and 42'-0" clear distribution center. New office mezzanines were constructed over existing interior loading docks, without impeding normal business operations. A400'-0" long, 12'-0" high snow shelf was constructedon the roof of the existing building to compensate for large difference in the heights of the two buildings.
Labrador 2004  |  74,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
New 74,000 sf head office for the natural spring water company serving as corporate offices and a shipping/distribution center complete with drive-through loading docks and 32’-0” high steel structure for storage
Moores Clothing 2004  |  84,500 sf
Contract delivery :
New 84,500 sf distribution center including 6,000 sf of offices and 120,000 sf of “veit” conveyor/racking system on 3 floors within the warehouse.
JAM Industries 2004  |  85,000 sf
Contract delivery :
Extension to existing distribution center, including offices, music labs and humidification controlled storage areas.
Canada Post Downtown Montreal Distribution Center 2003  |  86,000 sf
Contract delivery :
Fixed Price
New 86,000 square foot mail sorting facility, handling all of downtown Montreal’s mail, built for Canada Post, Canada’s national mail carrier.
SF Marketing 2005  |  90,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
New offices, distribution center and production facility for a high end audio and sound equipment distributor. The building includes a humidity controlled warehouse area and repair room for guitar storage and repair, production areas, 20,000 square feet of finished offices and a 2 storey acoustically treated showroom for high-end speaker and amplifier demonstrations.
«
1 - 2 - 3 - 4 - 5
»