Projects | Hospitality and Residential

Our diverse experience in this field began in the 1980’s as the international tourist and business boom gave rise to demand for independent high end hotels complete with business conference centers, banquet halls, restaurants and shopping areas. By 2021, Reliance had completed over 750 hotel rooms and associated conference spaces. As the market evolved and baby boomers turned into empty nesters, in addition to an ever-increasing demand for housing, high rise condominium and purpose built rental construction became more common. Our vast experience in this domain ranges from affordable residential units for first-time buyers to condominium developments for seasoned buyers, complete with high-end amenities. In 2009, the Canadian housing market emerged from the recession and by 2021, Reliance had completed or had under construction over 20,000 housing units in eastern Canada.

Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7
»
Fairmont Mont Tremblant 1997  |  350,000 sf
Contract delivery :
The center of the largest and most popular ski resort in Eastern North America, Chateau Mont Tremblant is a $35,000,000 development located at the edge of Mont Tremblant Park in Quebec’s Laurentian Mountains. Currently owned and managed by Fairmont Hotels, it includes a four-star, 317-room hotel, a shopping promenade, sports complex and a 40,000 square foot conference centre: all built by Reliance. The work was completed in just thirteen months, on schedule and within budget.
Club Marin III 2000  |  350,000 sf
Contract delivery :
Fixed Price
This 24 storey complex is a $18,600,000 development that consists of a sports complex, underground parking and main lobby. Reliance's responsibilities included the core and shell of the building including all mechanical systems. The work was completed in 18 months, within budget and ahead of schedule.
Sofitel Hotel 2002  |  226,000 sf
Contract delivery :
Construction Management
The office building at 1155 Sherbrooke West was converted into a four star hotel operated by Sofitel, a French hotel operator of luxury hotels. The entire building's finishes and mechanical/electrical systems were stripped and discarded, leaving only the building's structure. New mechanical, electrical and life safety systems were installed to accommodate hotel room occupancy. An elaborate curtain wall skin and new extensions were added to the building to upgrade its aesthetics and provide meeting room and conference centre space. Construction also included a complete main kitchen for service to 258 rooms and 8,000 square feet of banquet facilities / meeting room space. The total square footage of the building, upon the project's completion was 226,000 square feet.
Au Village du Musée 2005  |  60,455 sf
Contract delivery :
Construction Management
A 5-storey condominium development consisting of 6,000 sf of below ground parking, upgrade lobby and 47 finished luxury condo units. Reliance was responsible for completion and fit up of all 47 units according to the individual owner's requirements, including renovation to an existing building (circa 1890) configured for 5 ultra-luxurious "historic" condo units.
Époques Phase 2 2005  |  63,000 sf
Contract delivery :
Construction Management
A 61 unit, 63,000 square foot condo development, undertaken for Prevel in Old Montreal, Quebec. The quaint location for the project required underpinning of two existing turn-of-the-century buildings. The development includes a rooftop terrace with a “Zen” basin. All units are complete with hardwood flooring, hardwood doors and frames, and European kitchens and appliances.
La Marquise 2005  |  331,000 sf
Contract delivery :
Construction Management
A 13 storey condominium development consisting of 104,000 sf of below grade parking, lobby and health complex including a swimming pool and 227,000 sf of finished luxury condo units. Reliance was responsible for a complete turn-key project, including core and shell, all mechanical systems and fit up of all 113 units according to the individual owner's requirements.
Lowney's Phase I 2005  |  70,000 sf
Contract delivery :
Construction Management
Conversion and restoration of the 1902 Lowney’s wood structure chocolate factory (two buildings) to accommodate a new 110 unit condo development. Phase I of the development includes 1 floor of underground parking, exposed wood beams within each unit, a rooftop terrace complete with swimming pool, and contemporary finishes.
Paris Star Lofts 2005  |  175,000 sf
Contract delivery :
Construction Management
This 6 storey, 84 unit condo conversion from a former dye factory in Montreal's Plateau Mont-Royal district included the complete stripping ofthe building to its bare structure fora new facade of precast, balconies, brick and floor to ceiling windows. The "loft" unit concept includes european kitchens, 12'-0" exposed concrete ceilings, and high end finishes.
The Appalachian 2006  |  190,000 sf
Contract delivery :
Construction Management
This 190,000 square foot multi-family, upscale, condo-hotel development is located in the ski resort of Mountain Creek, New Jersey. All units include full kitchens with granite, elegant bathrooms, gas fireplaces and balconies. The building amenities include a 24 / 7/ 365 pool and spa, heated sidewalks, fitness centre, business centre and a public hot steam/sauna.
90 George St. 2007  |  330,000 sf
Contract delivery :
Fixed Price
This 330,000 square foot 26-storey downtown high-rise luxury condominium development in Ottawa, Ontario, Canada consists of 104 luxury condo units, including 4 penthouses, three floors of commercial / retail and 4 storeys of underground parking. All units include hardwood floors, 4 pipe fan coil units, custom hardwood kitchens with granite countertops and high end plumbing fixtures.
«
1 - 2 - 3 - 4 - 5 - 6 - 7
»