Aura 2014  |  1,695,000 sf
Contract delivery :
Construction Management
This 1.7 million sf, 79 storey residential tower is Canada's fourth tallest condominium building and ranks among the top 100 tallest buildings in the world. Five stories of underground parking accommodate the 940 residential units including five floors of ultra luxurious penthouses. A 5 storey, 250,000 sf podium sits at the base of the tower.
During construction, a temporary loading dock access ramp was built to be in operation 24 hours a day while a permanent steel bridge was constructed through the site using top-down construction methods. Not only is Aura one of the first fully sprinklered residential building in Toronto, but it also includes individual water source heat pumps for each unit.
2033 Clark 2014  |  28,000 sf
Contract delivery :
Construction Management
Construction of new condominium, restoring the existing historic brick facade. Originally a two storey building, two additional storeys will be added, marrying a modern facade to the historic one below. To accommodate a new underground parking garage, underpinning of the existing facade and the neighbor's properties was necessary. The building houses 22 residential units with hardwood floors and European style kitchens.
Zuni 2014  |  260,000 sf
Contract delivery :
Construction Management
This 7 storey, 164 unit condominium is located on the northern tip of Nun's Island, overlooking the water. Built with innovative energy design in mind, this luxurious apartment building has brick and curtain wall facades, balconies, and european kitchens in every unit.
Target - 8 Stores 2013  |  Average 100,000 sf
Contract delivery :
Construction Management
As part of Target's entrance into Canada and the opening of 125 new stores, Target interviewed and pre-selected Reliance as one of it's 11 general contractors across Canada to convert existing Zellers stores to Target's standards. Reliance's work involved stores in Quebec and Ontario and included everything from new facades, to structural work, including seismic upgrades and complete new interiors beyond shell. Reliance complied with a rigorous 16 week schedule mandated by Target for their conversions.
Hard Candy Toronto 2013  |  45,000 sf
Contract delivery :
Construction Management
Madonna's new international gym brand. Hard Candy opened its first and only North American location in Toronto. This 45,000 sq. ft. high-end facility includes hot yoga, spinning classes, free weights and a luxurious locker and spa facility.
Evolo Pavillion 2013  |  80,000 sf
Contract delivery :
Construction Management
Pavillon C is the first waterfront mid-rise building on Pointe-Nord, Nuns’ Island that offers the exclusive opportunity to live in an intimate building, on the water’s edge, nestled between the pedestrian plaza and the gardens of Evolo 2. This five-storey building, consisting of only 39 condos ranging from 665 to 1,175 sq ft, plus four exclusive penthouses with vast rooftop terraces, is a model of intelligent design. Layouts of the condos were carefully planned to maximize the value of every square foot. The ground floor includes a retail pavilion featuring trendy shops and restaurants.
Canada Post Control Center 1993  |  20,000 sf
Contract delivery :
Part of the head office complex for Canada Post in Ottawa, the Control Center accounted for almost $20,000,000 of the project’s overall construction cost, a figure indicative of the complexity of the work involved. It houses the world’s most sophisticated mail monitoring system, together with advanced-technology communications and computing facilities that tie the system to regional centers across the country and provide its national intelligence. Built to clean room standards, the center features multi-level computer flooring, several thousand meters of communication and power cabling, and provision for special systems to control air exchanges within the environment.
1250 Greene Avenue 2013  |  132,000 sf
Contract delivery :
Construction Management
With neoclassical architecture inspired by the great Parisian boulevards including a 100% stone-clad exterior, 1250 Avenue Greene comprises some twenty exclusive residences offering the intimacy of individual homes, designed and constructed to the personal taste and lifestyle of each owner. With its numerous balconies and landscaped terraces, high-end mechanical systems including a heat re-capture and humidification, 1250 Avenue Greene sets a new standard in residential construction in Montreal.
Wilson Lofts 2012  |  140,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
Retrofit of a 1909 paper factory into an upscale loft style condominium in downtown Montreal overlooking a park. Originally six storeys, a complete reinforcement of the existing structure was necessary to carry an additional four floors. The building houses 98 residential units with 12' 0" exposed concrete ceilings and columns, exposed brick walls, and bamboo hardwood floors. Each unit is equipped with European kitchens, appliances, and plumbing fixtures.
Forest Hill 2012  |  127,000 sf
Contract delivery :
Fixed Price
This nine storey, 75 unit condominium is located at the base of Mount Royal. Each unit includes a european style kitchen and hardwood floors. The building is equipped with underground parking and lavish landscaping.
«