Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»
Audi Queensway 2019  |  65,000 sf
Contract delivery :
Construction Management
This Audi Queensway is a 65,000 sq.ft. dealership located at The Queensway and East Mall featuring to the new Audi identity. The dealership includes a 20,000 sq.ft. showroom, 10,000 sq.ft. used car display, and a state of the art service facility with equipment able to handle over 25 vehicles at any given time. The facility also includes a 15,000 sq.ft. basement for additional services as required. The building is equipped with an in ground filtration and recharger systems to limit the storm water discharge into the city storm water systems. A 35,000 sq.ft. green roof was installed to also assist with storm water retention. A gorgeous landscaped patio, customer bistro and car wash were also installed.
YC Condos 2019  |  650,000 sq.ft.
Contract delivery :
Construction Management
$130M residential tower at Yonge at College in downtown Toronto, featuring 636 residential units and developed by Canderel and Kingsett Capital. This modern and timeless 62 storey glass tower includes retail spaces located on the first 2 floors, 'live & work' units on 4th & 5th floors, and amenity spaces on the top floors. The amenity spaces include an infinity pool overlooking downtown Toronto, and a full spa for men and women. The residential suites include high end finishes and appliances.

Central Parc Laval R1 2019  |  352,000 sq.ft.
Contract delivery :
Construction Management
22-storey apartment project featuring 198 high-end rental units. Located near Carrefour Laval, this building is planned to be part of 6 building multi-use residential complex including a large private park, commercial units and a hotel. The building features two-storeys of underground parking, a rooftop pool and a gym with a scenic view and panoramic windows at the top floor. Due to new zoning regulations and restrictions, Central Parc Laval R1, R2 and C1 will be the last buildings allowed in Laval above 15 storeys.

Le Faubourg 2019  |  60,000 s.f.
Contract delivery :
Construction Management
The renovation of this existing commercial shopping center includes complete asbestos abatement and the addition of a brand new foodcourt and grocery store while tenants remain in operation. The project was designed by Geiger Huot Architects and is scheduled for completion in April 2018.

Gallery sur le Canal Phase 2 2019  |  240,000 sf
Contract delivery :
Construction Management
The second phase of this Griffintown project, Gallery Lofts sur le Canal 2, will feature 145 luxurious condo units over a total of 240,000 sf. Located near the Lachine Canal, two towers of 14 and 9 floors respectively will complete this concept elaborated by Geiger Huot Architects. The project is currently under construction.
BRIX 2019  |  326,000 sf
Contract delivery :
Construction Management
This 16-storey, 275 units residential rental property is situated in the heart of downtown Montreal and includes 3 underground parking levels. Its envelope is composed of curtain wall, brick, precast, and will incorporate the existing facade of the 400 Dowd heritage building which was fully restored to its original look, and merged with a new and modern addition.

In order to reach the desired basement levels, Reliance needed to blast 5 meters of rock. Seismographs were installed in various locations in order to monitor the vibrations of the surroundings buildings. In order not to disturb the adjacent historical building's rubble foundations, Reliance proposed a secant wall installation in lieu of conventional underpinning. A method rarely used in Montreal.


Méga Parc 2019  |  150,000 sf
Contract delivery :
Construction Management
Galeries de la Capitale has revamped its attraction park! Inspired by the steampunk universe, the new Méga Parc includes 18 rides and attractions, the longest skating path in the country, a stage with a complete sound system, a giant screen, an interactive water fountain displaying sound and light choreography and the very first hubless wheel in North America!





Le Cour Langhorne 2018  |  61,000 sf
Contract delivery :
Construction Management
Luxurious 3 storey townhouses located in the upscale neighbourhood of Hampstead, Quebec. Including 2, 3, 4, and 5 bedrooms options, the units range from 2,580 sf to 3,120 sf with private 2 car underground garages and 9’ ceilings. The development also includes luxurious yards for each townhouse, car charging station infrastructure, and innovative energy conservation design elements. The project is developed by The Benvenuto Group and designed by NEUF Architect(e)s.


Jarvis St. Residences 2018  |  200,000 sf
Contract delivery :
Construction Management
This new modern student residence in downtown Toronto features 194,000 sq.ft of student accommodation and at-grade retail, in a 30-storey building offering a mix of two, three and four bedroom units to house a total of 593 students. The two-storey podium offers a mix of amenity services to enhance the student experience. In addition, “Pod Lounges” located every third floor are designed to provide congregation space for smaller student gatherings, as well as provide a unique design expression to the building’s main façade.

Decarie Motors 2018  |  12,500 sf
Contract delivery :
Construction Management
Demolition and renovation of an existing dealership to meet the new design requirements of Land Rover and Jaguar totaling12,500 sf and including a complete new showroom.

«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»