Liberty Industrial Park 1993 - 2002  |  12 office buildings totalling 700,000 sf
Contract delivery :
Fixed Price
These twelve office buildings featuring class A office fit-ups averaging over 60,000 square feet each, were built between 1993 and 2002 for Liberty Sites Inc. Each structure’s exterior and interior design are unique and were constructed using select materials and finishes, making these facilities some of the most sought-after office space components in Montreal and a benchmark for comparison for new suburban office buildings. In addition to completion of each building’s core and shell for Liberty, Reliance successfully completed tenant fit-ups for clients such as Sony, Motorola, Simmonds, Consoltex, Bell Mobility, Rhone-Poulec Rorer, Robin Hood, Abbott Laboratories, Pitney Bowes, ABB and Medis.
Tour des Canadiens 2016  |  699,000 sf
Contract delivery :
Construction Management
This high profile, 50 storey, 552 unit condominium building is the first new project in Montreal to be connected to Montreal's famed "underground city", and the first project to be associated with the fabled Montreal Canadiens hockey team. Developed jointly by Cadillac Fairview, The Montreal Canadiens, Canderel, and the FTQ, the building is also connected to the AMT (Montreal's regional rail station), includes an exterior pool, lavish party rooms, lounges, fitness space, and a private spa area. The underground portion of the project includes a world-class sports bar, connected directly into the Bell Centre with independent VIP access for the Montreal Canadiens players. The interior of the units include European style kitchens complete with appliances, and designer bathrooms with customized fixtures.
Tour des Canadiens 3 2020  |  685,000 sq.ft.
Contract delivery :
Construction Management
The third phase of the famed residential Tour des Canadiens project, located just south of the Bell Center, includes an all-glass 54 storey, 528,000 sq.ft. above grade tower featuring 565 residential units. The building’s amenities of this $150M project encompasses multiple party rooms, retail stores, a gym, a game room, an indoor pool, a lounge, a spa and outdoor terraces, and an indoor rooftop skylounge. The landscape components include not one, but two parks adjacent to the tower – including a unique urban design for a pocket park with water features on north and south sides.

YC Condos 2019  |  650,000 sq.ft.
Contract delivery :
Construction Management
$130M residential tower at Yonge at College in downtown Toronto, featuring 636 residential units and developed by Canderel and Kingsett Capital. This modern and timeless 62 storey glass tower includes retail spaces located on the first 2 floors, 'live & work' units on 4th & 5th floors, and amenity spaces on the top floors. The amenity spaces include an infinity pool overlooking downtown Toronto, and a full spa for men and women. The residential suites include high end finishes and appliances.

Kingsway Under construction  |  650,000 sq.ft.
Contract delivery :
Construction Management
Featuring a total of 474 new suites, the redevelopment of these 5 low rise buildings consists of two new rental buildings, two new condo buildings, and one existing rental building. Located in the charming Kingsway Village area of Etobicoke, there is an abundance of green roof space incorporated into each building, 559 underground parking spaces, and 389 bicycle spaces.

The numerous buildings range from 7 to 17 storeys and include amenities such as a fitness room, party room, outdoor terraces, laundry room, games rooms, private dining rooms, event lounge, tech lounge, and pet spa.

Simons 2019  |  580,000 sq.ft.
Contract delivery :
Fixed Price
Simons new 40' high distribution facility in Quebec City includes 470,000 sq.ft. of warehouse, 47 shipping and receiving doors, along with an attached 110,000 sq.ft. office facility.
Montreal Forum / Pepsi Forum 2000  |  560,000 sf
Contract delivery :
Fixed Price
The Forum, former home to the world famous Montreal Canadiens hockey team, had been empty for years. Rather than demolish the vacant building, Canderel and its partners, the Simon Property Group, DLJ Real Estate and Madison Marquette undertook the challenge of redevelopment, uniting the building's history and future to create a one-of-a-kind, modern entertainment venue, including movie theaters, restaurants and retail space at a cost of approximately 100 million dollars. The existing roof was raised 18'-0" to increase retail space and accommodate a 65'-0" IMAX screen, 3 levels of underground parking, 22 AMC movie theaters, a 3-storey restaurant/bar and smaller retail tenant spaces. The Forum remains one of Montreal's most recognizable landmarks.
Symphonia VIU 2024  |  550,000 sq.ft
Contract delivery :
Construction Management
Construction of the phase 2A project comprising 46 floors including 2 floors of underground parking. The podium and garage total 68,000 square feet and each typical floor of the tower will be 9,000 square feet. The curtain wall envelope, the interior finishes of the condos including high-end engineering flooring, Miele and Bosch appliances, and Eruopean style doors, as well as the common areas including an interior pool, a sauna and a gym, all highlight the high-end status of this project.
Ericsson 1984 - 2002  |  550,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
Over the course of 7 consecutive years, Reliance formed an integral part of the project team acting as General Contractor for Ericsson’s North American Research and Development Center. Once completed, Reliance had built over 550,000 square feet of new construction, consisting of 4 buildings and had completely renovated 250,000 square feet of existing space. Each building included separate underground parking linked by underground tunnels. All office areas were constructed to Class ‘A’ specifications and included details such an open atrium, a cafeteria with a full commercial kitchen and recreational facilities. All phases of the project were executed on a fast track basis.
750 Peel Under construction  |  544,612 sq.ft.
Contract delivery :
Construction Management
Construction of a new residential tower intended for rental apartments. The building is a concrete structure with three basement levels and 37 stories above grade. Three sides of the perimeter are shored with a soldier pile and wood lagging wall. The building has 509 residential units as well as one large commercial space. The building includes 5 elevators on a destination dispatch system as well as a 6th elevator exclusively for the commercial space and access to the parking garage.
«