Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16
»
The Peterson 2017  |  367,000 sf
Contract delivery :
Construction Management
Architecturally inspired by the area in which it is located - Montreal's "Quartier des Spectacles" district - this 35 storey, 284 unit "festive" building's theme is clearly evident in its design. The project includes 18'-6" high ceiling lofts and 16' windows on the first 5 floors, a rock climbing wall, and a sky-terrace on the 28th floor for concert viewing and barbecuing. The units feature modern finishes, European appliances and efficient kitchens.

Tour des Canadiens 2016  |  699,000 sf
Contract delivery :
Construction Management
This high profile, 50 storey, 552 unit condominium building is the first new project in Montreal to be connected to Montreal's famed "underground city", and the first project to be associated with the fabled Montreal Canadiens hockey team. Developed jointly by Cadillac Fairview, The Montreal Canadiens, Canderel, and the FTQ, the building is also connected to the AMT (Montreal's regional rail station), includes an exterior pool, lavish party rooms, lounges, fitness space, and a private spa area. The underground portion of the project includes a world-class sports bar, connected directly into the Bell Centre with independent VIP access for the Montreal Canadiens players. The interior of the units include European style kitchens complete with appliances, and designer bathrooms with customized fixtures.
Dollarama 2016  |  510,000 sf
Contract delivery :
Fixed Price
Demolition of the existing buildings started in the late fall of 2015. The project includes a new 510,000 sf 45’ high warehouse located in Lachine, Quebec at the corner of Louis Amos and 23rd Avenue. The facility, along with its 46 loading doors and 7500 SF of finished offices, was delivered in early fall of 2016.

Agropur 2016  |  490,000 sf
Contract delivery :
Construction Management
This $70M LEED™ certified corporate campus of 490,000 sq.ft. has 800 underground parking spots, an innovative hot-water perimeter heating incorporating an energy-recovery system, and cooling and state of the art LED interior lighting. The exterior facade is primarily curtain wall and the interior is constructed with the latest in modern office design.
777 Bay St. 2016
Contract delivery :
Construction Management
Located on the corner of Bay & College Street, 777 Bay St. is a 30 storey Class "A" tower with two levels of retail concourse, bridging the gap between Bloor Street and Toronto's financial core. 777 Bay Street is one of the pioneer buildings in Toronto's dynamic neighborhood where recent growth is seen in the residential, commercial, and retail sectors. Surrounding the building within a one block radius is Toronto's hospital corridor, the MaRS Medical Research Development, and Queen's Park.
Construction began in the fall of 2015 and will include a complete renovation of the two floor retail concourse along with the building's 3 lobbies, exterior 32,000 SF plaza, and the addition of 4 new elevators to accommodate the building's increased densification program.

Aquablu 2017  |  246,000 sf
Contract delivery :
Construction Management
A new luxury development located along the riverfront in Laval, Quebec. This 3 phased project includes 3 high rise condominium towers and ''beach houses'', all appointed with Poggenpohl™ kitchens, oversized tiling in the bathrooms, high end appliances, several pools, and spas, European style day-lounges and lushly appointed amenity spaces.

M sur la Montagne 2015  |  280,000 sf
Contract delivery :
Construction Management
Nestled in a private forested enclave in the heart of downtown Montreal, this former convent built in 1895 was transformed into 95 ultra-high end condominiums in 2 separate buildings; the original building from 1895 and a new modern glass building on the property. The project includes 18 acres of landscaped area, imported Italian kitchens, an indoor swimming pool, and lush finish accents throughout.
Gallery Lofts sur le Canal 2016  |  191,000 sf
Contract delivery :
Construction Management
The first phase of this 14 storey residential building consists of 132 residential units, including areas on the ground floor reserved for commercial spaces, and 2 full underground parking garages.

Mercedes Benz 2015  |  62,300 sf
Contract delivery :
Fixed Price
Being constructed on a 5 acre site at the corner of Mayfield Road and Hwy 410, this state-of-the-art $13M facility will include a 62,000 sq-ft building.The dealership features a 25,000 sq.ft showroom equipped to handle more than 20 vehicles at any given time. The facilities also include a customer bistro, car wash and workout facilities for staff and customers.The dealership was completed in the new Mercedes Benz Corporate Signature brand and opened its doors spring 2015.
Browns Shoes 2014  |  131,500 sf
Contract delivery :
This fast-track project has a poured-concrete office structure, including post-tensioned structural slabs. It includes two storeys of high-end head office space, and three additional levels of office mezzanines, a 90,000 sf warehouse and an indoor parking garage. With its white TPO roof and other "green" features, the project has achieved LEED™ Silver certification.

«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16
»