Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15
»
Bell Canada Head Office 2009  |  1,850,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
This project is the Corporate Headquarters for Canada's national phone carrier. Reliance's mandate began prior to the selection of the consulting engineers, with Reliance acting as master team leader and design-builder. All budgeting, scoping and value engineering was performed by Reliance prior to the completion of design drawings. Initially, Reliance's mandate included the construction of 1,200,000 square feet of gross constructed area of building and a tenant fit up of 570,000 square feet, to be completed within an 18 month fast-track schedule. In August of 2007, Reliance's mandate was increased to include Phase II, consisting of an additional 440,000 square feet of gross constructed area, containing 200,000 square feet of below grade parking and 240,000 square feet of additional finished space above grade. The project was designed as a LEED certified (Leadership in Environmental and Energy Design) campus site for 4,600 employees, comprising three architectural precast/curtain wall office buildings of 4, 5 and 8 storeys all interconnected by glazed atriums for Phase I, and two precast/curtain wall buildings of 5 and 3 storeys interconnected by an atrium for Phase II. The ground floors are designed to include retail spaces replicating a city core environment surrounded by a fully landscaped interior courtyard of 200,000 square feet complete with walking paths and an outdoor amphitheater. The complex also includes a 2 storey cafeteria for phase I and a 9,000 square foot cafeteria for Phase II, a gym and spa, a day care center, 3 atriums of 3 and 4 storeys, 27 elevators, 20,000 square feet of state of the art conference and training center space, high level security systems and an elaborate automated temperature and environmental control system. Parking for 2,150 cars, totaling 800,000 square feet, is constructed underneath the entire campus.
Canada House Under contruction  |  1,730,000 sq.ft.
Contract delivery :
Construction Management
This iconic super high-rise twin tower, Canada House, located next to the Rogers Center, and developed by Concord Pacific Group, is valued at over $400 million, includes an 82 and a 70 storey tower, totaling over 1,730,000 sf of construction, 1,397 units, luxurious amenities such as touchless car wash facilities, 6 levels of underground parking and a 12 storey podium.



Canada House's design is a tribute to all that is Canadian. Included in the façade are specifically designed lights and colored panels, that once illuminated, take the shape of the Canadian Maple Leaf. Additionally, an exterior "lake" for canoeing, echoing Canada's vast rivers, transforms into a skating rink in the winter. The suites include oversize tiled bathrooms, fully decked balconies, complete with infrared heaters, like the ones found on restaurant terraces across Canada, custom doors and frames, and Miele's newest technological achievement - ductless dryers.

Aura 2014  |  1,695,000 sf
Contract delivery :
Construction Management
This 1.7 million sf, 79 storey residential tower is Canada's fourth tallest condominium building and ranks among the top 100 tallest buildings in the world. Five stories of underground parking accommodate the 940 residential units including five floors of ultra luxurious penthouses. A 5 storey, 250,000 sf podium sits at the base of the tower.
During construction, a temporary loading dock access ramp was built to be in operation 24 hours a day while a permanent steel bridge was constructed through the site using top-down construction methods. Not only is Aura one of the first fully sprinklered residential building in Toronto, but it also includes individual water source heat pumps for each unit.
Seasons Under contruction  |  926,000 sq.ft.
Contract delivery :
Construction Management
Seasons, a twin tower family oriented development in North York, developed by Concord Pacific Group, is valued at $200 million, includes a 39 and a 42 storey tower, 926,000 sf of construction, 694 suites and townhouses, and luxurious amenities such an outdoor skating rink, lush landscaping, 4 levels of underground parking and a 2 storey podium.



The Seasons project is a continuation and evolution of the Park Place development located in North York where a new destination for family living has been created. This project continues the tradition of extensive amenities as part of the project, in addition to lush green spaces, and a park area, and features 4 floors of underground parking, and a 2 floor podium. The suites include luxurious bathrooms, high-end European appliances and functional kitchens.

Bronte Village Under construction  |  862,000 s.f.
Contract delivery :
Located in picturesque South Oakville, the redevelopment of the existing 1970’s era Bronte Village Mall will include the construction of two new modern residential towers that will contain 481 luxurious suites with 614 underground spaces and will also include the addition of 15,000 square feet of retail space. The suites will range from 700 square feet to over 1200 square feet and will be equipped with high end finishes and appliances. Additionally the buildings will be fully equipped with amenities including a pool, roof-top patio and lounge, party room, and a fitness room. Developed by Crombie REIT and Prince Development, this revitalization will hold true to the current aesthetic and culture of the Bronte neighbourhood and will bring an attractive and exciting renewal to the area.

National Headquarters Canada Post Corporation 1993  |  800,000 sf
Contract delivery :
Canada Post’s $80,000,000 headquarters, located in Ottawa, Ontario, Canada, features 800,000 square feet of office space in two ten story towers, a separate, above-ground parking facility for 950 cars and a space-age network control centre (see Advanced Technology Section – Canada Post Control Center). Undertaken on a fast-track basis for the developer, Standard Life, the project was completed in just sixteen months – six months ahead of schedule. It has won multiple awards for energy efficiency and architectural design and was the feature on the Canadian postal 38 cent stamp for most of 2002 and 2003.
Mobilia 1991 - 2007  |  5 centers totalling 750,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
Our relationship with Mobilia and their real estate arm began in 1991 with the construction of their second retail development project. We have since built, and later expanded all of the shopping centers developed by CPD which total 5 retail centers comprising roughly 750,000 sf. Located in the Montreal region (Laval, Brossard, Anjou, Pointe-Claire and St-Hubert) these projects were all completed on a Project Management basis with Reliance acting as site selection consultant and project design cost consultants in addition to construction managers.
DNA 3 2014  |  742,000 sf
Contract delivery :
Construction Management
"Downtown Toronto's Next address" is the third phase of Canderel Stoneridge's DNA project. Situated in the popular King West Neighbourhood, the building is very close to the trendy Liberty Village and within minutes of the entertainment, theatre and fashion districts and a short commute from the downtown core.
This 742,000 sf, 600-unit project includes 2 buildings joined by a retail podium, underground parking, three courtyards, rooftop terraces, and an all glass exterior facade. Units comprise nine foot ceilings, high-end finishes and spacious balconies.
Liberty Industrial Park 1993 - 2002  |  12 office buildings totalling 700,000 sf
Contract delivery :
Fixed Price
These twelve office buildings featuring class A office fit-ups averaging over 60,000 square feet each, were built between 1993 and 2002 for Liberty Sites Inc. Each structure’s exterior and interior design are unique and were constructed using select materials and finishes, making these facilities some of the most sought-after office space components in Montreal and a benchmark for comparison for new suburban office buildings. In addition to completion of each building’s core and shell for Liberty, Reliance successfully completed tenant fit-ups for clients such as Sony, Motorola, Simmonds, Consoltex, Bell Mobility, Rhone-Poulec Rorer, Robin Hood, Abbott Laboratories, Pitney Bowes, ABB and Medis.
Tour des Canadiens 2016  |  699,000 sf
Contract delivery :
Construction Management
This high profile, 50 storey, 552 unit condominium building is the first new project in Montreal to be connected to Montreal's famed "underground city", and the first project to be associated with the fabled Montreal Canadiens hockey team. Developed jointly by Cadillac Fairview, The Montreal Canadiens, Canderel, and the FTQ, the building is also connected to the AMT (Montreal's regional rail station), includes an exterior pool, lavish party rooms, lounges, fitness space, and a private spa area. The underground portion of the project includes a world-class sports bar, connected directly into the Bell Centre with independent VIP access for the Montreal Canadiens players. The interior of the units include European style kitchens complete with appliances, and designer bathrooms with customized fixtures.
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15
»