Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16
»
Dollarama 2019  |  270,000 sf
Contract delivery :
Construction Management
270,000 sq.ft.expansion of one of Dollarama's distribution centers in TMR. The expansion involves 27 new loading docks and a 60,000 sq.ft. mezzanine. The project includes the demolition of two existing industrial buildings to make way for the new expansion.
MYX Condos Under construction  |  378,000 sf
Contract delivery :
Construction Management
MYX condos, the next installment in a mix of condos, lofts and townhouses that includes Evolo X, Evolo S, Evolo 2, Evolo 1, Pavillon Evolo and ZUNI, located on the Pointe-Nord in Nun’s Island includes 378,000 sq.ft. of gross constructed area and is scheduled to start in the fall of 2018. The project consists of 196 units over 8 storeys and will feature a rooftop pool and chalet complete with kitchen, fireplace, communal table, indoor and outdoor lounges, and a state of the art rooftop gym. Additionally, the commercial ground floor will feature outdoor covered parking for commercial clients.
YC Condos 2019  |  650,000 sf
Contract delivery :
Construction Management
A new $130M residential tower at Yonge at College in downtown Toronto, featuring 636 residential units and developed by Canderel and Kingsett Capital. This modern and timeless 62 storey glass tower includes retail spaces located on the first 2 floors, 'live & work' units on 4th & 5th floors, and amenity spaces on the top floors. The amenity spaces include an infinity pool overlooking downtown Toronto, and a full spa for men and women. The residential suites include high end finishes and appliances.

Central Parc Laval R1 2019  |  352,000 sf
Contract delivery :
Construction Management
22-storey apartment project featuring 198 high-end rental units. Located near Carrefour Laval, this building is planned to be part of 6 building multi-use residential complex including a large private park, commercial units and a hotel. The building features two-storeys of underground parking, a rooftop pool and a gym with a scenic view and panoramic windows at the top floor. Due to new zoning regulations and restrictions, Central Parc Laval R1, R2 and C1 will be the last buildings allowed in Laval above 15 storeys.

Gallery sur le Canal Phase 2 2019  |  240,000 sf
Contract delivery :
Construction Management
The second phase of this Griffintown project, Gallery Lofts sur le Canal 2, will feature 145 luxurious condo units over a total of 240,000 sf. Located near the Lachine Canal, two towers of 14 and 9 floors respectively will complete this concept elaborated by Geiger Huot Architects. The project is currently under construction.
Le Faubourg 2019  |  60,000 s.f.
Contract delivery :
Construction Management
The renovation of this existing commercial shopping center includes complete asbestos abatement and the addition of a brand new foodcourt and grocery store while tenants remain in operation. The project was designed by Geiger Huot Architects and is scheduled for completion in April 2018.

BRIX 2019  |  326,000 sf
Contract delivery :
Construction Management
This 16 storey residential rental property is situated in the heart of downtown Montreal and includes 3 underground parking levels. Its envelope will be composed of curtain wall, brick, precast, and will incorporate the existing facade of the 400 Dowd heritage building which will be fully restored to its original look, and merged with a new and modern addition.

In order to reach the desired basement levels, Reliance needed to blast 5 meters of rock. Seismographs were installed in various locations in order to monitor the vibrations of the surroundings buildings. In order not to disturb the adjacent historical building's rubble foundations, Reliance proposed a secant wall installation in lieu of conventional underpinning. A method rarely used in Montreal.

Opening is planned for summer 2019.

Méga Parc 2019  |  150,000 sf
Contract delivery :
Construction Management
Galeries de la Capitale has revamped its attraction park! Inspired by the steampunk universe, the new Méga Parc includes 18 rides and attractions, the longest skating path in the country, a stage with a complete sound system, a giant screen, an interactive water fountain displaying sound and light choreography and the very first hubless wheel in North America! The construction started in September 2017.





LeCour Langhorne 2018  |  61,000 sf
Contract delivery :
Construction Management
Luxurious 3 storey townhouses located in the upscale neighbourhood of Hampstead, Quebec. Including 2, 3, 4, and 5 bedrooms options, the units range from 2,580 sf to 3,120 sf with private 2 car underground garages and 9’ ceilings. The development also includes luxurious yards for each townhouse, car charging station infrastructure, and innovative energy conservation design elements. The project is developed by The Benvenuto Group and designed by NEUF Architect(e)s.


Decarie Motors 2018  |  12,500 sf
Contract delivery :
Construction Management
Demolition and renovation of an existing dealership to meet the new design requirements of Land Rover and Jaguar totaling12,500 sf and including a complete new showroom.

«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16
»