Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16
»
Ogilvy - Holt Renfrew Under construction  |  217,000 sf
Contract delivery :
Construction Management
The complete renovation and transformation of the existing 217,000 square foot Ogilvy Store as well as an expansion of 40,000 sf of retail space in the new Quadrilatère de la Montagne building started in the fall of 2017. A unique feature of this project is the articulated storefront and canopy at the new public entrance, on Ave. de la Montagne. This project, once completed, will become the flagship store for the Holt Renfrew banner.
Tour des Canadiens 3 Under construction  |  685,000 s.f.
Contract delivery :
Construction Management
The third phase of the famed residential Tour des Canadiens project, located just south of the Bell Center, includes an all-glass 54 storey, 528,000 sq.ft. above grade tower featuring 565 residential units. The building’s amenities of this $150M project encompasses multiple party rooms, retail stores, a gym, a game room, an indoor pool, a lounge, a spa and outdoor terraces, and an indoor rooftop skylounge. The landscape components include not one, but two parks adjacent to the tower – including a unique urban design for a pocket park with water features on north and south sides.

Audi Queensway Under construction  |  65,000 sf
Contract delivery :
Construction Management
This Audi Queensway is a 65,000 sq.ft. dealership located at The Queensway and East Mall featuring to the new Audi identity. The dealership includes a 20,000 sq.ft. showroom, 10,000 sq.ft. used car display, and a state of the art service facility with equipment able to handle over 25 vehicles at any given time. The facility also includes a 15,000 sq.ft. basement for additional services as required. The building is equipped with an in ground filtration and recharger systems to limit the storm water discharge into the city storm water systems. A 35,000 sq.ft. green roof was installed to also assist with storm water retention. A gorgeous landscaped patio, customer bistro and car wash were also installed.
Dollarama Under construction  |  270,000 sf
Contract delivery :
Construction Management
270,000 sq.ft.expansion of one of Dollarama's distribution centers in TMR. The expansion involves 27 new loading docks and a 60,000 sq.ft. mezzanine. The project includes the demolition of two existing industrial buildings to make way for the new expansion.
MYX Condos Under construction  |  378,000 sf
Contract delivery :
Construction Management
MYX condos, the next installment in a mix of condos, lofts and townhouses that includes Evolo X, Evolo S, Evolo 2, Evolo 1, Pavillon Evolo and ZUNI, located on the Pointe-Nord in Nun’s Island includes 378,000 sq.ft. of gross constructed area and is scheduled to start in the fall of 2018. The project consists of 196 units over 8 storeys and will feature a rooftop pool and chalet complete with kitchen, fireplace, communal table, indoor and outdoor lounges, and a state of the art rooftop gym. Additionally, the commercial ground floor will feature outdoor covered parking for commercial clients.
YC Condos 2019  |  650,000 sf
Contract delivery :
Construction Management
A new $130M residential tower at Yonge & College in downtown Toronto, featuring 636 residential units and developed by Canderel and Kingsett Capital. This modern and timeless 62 storey glass tower includes retail spaces located on the first 2 floors, 'live & work' units on 4th & 5th floors, and amenity spaces on the top floors. The amenity spaces include an infinity pool overlooking downtown Toronto, and a full spa for men and women. The residential suites include high end finishes and appliances.

Central Parc Laval Under construction  |  352,000 sf
Contract delivery :
Construction Management
22-storey apartment project featuring 198 high-end rental units. Located near Carrefour Laval, this building is planned to be part of 6 building multi-use residential complex including a large private park, commercial units and a hotel. The building features two-storeys of underground parking, a rooftop pool and a gym with a scenic view and panoramic windows at the top floor. Due to new zoning regulations and restrictions, Terra will be the last building allowed in Laval above 15 storeys.

Gallery sur le Canal Phase 2 Under construction  |  240,000 sf
Contract delivery :
Construction Management
The second phase of this Griffintown project, Gallery Lofts sur le Canal 2, will feature 145 luxurious condo units over a total of 240,000 sf. Located near the Lachine Canal, two towers of 14 and 9 floors respectively will complete this concept elaborated by Geiger Huot Architects. The project is currently under construction.
Le Faubourg Under construction  |  60,000 s.f.
Contract delivery :
Construction Management
The renovation of this existing commercial shopping center includes complete asbestos abatement and the addition of a brand new foodcourt and grocery store while tenants remain in operation. The project was designed by Geiger Huot Architects and is scheduled for completion in April 2018.

BRIX 2019  |  326,000 sf
Contract delivery :
Construction Management
This 16 storey residential rental property is situated in the heart of downtown Montreal and includes 3 underground parking levels. Its envelope will be composed of curtain wall, brick, precast, and will incorporate the existing facade of the 400 Dowd heritage building which will be fully restored to its original look, and merged with a new and modern addition.

In order to reach the desired basement levels, Reliance needed to blast 5 meters of rock. Seismographs were installed in various locations in order to monitor the vibrations of the surroundings buildings. In order not to disturb the adjacent historical building's rubble foundations, Reliance proposed a secant wall installation in lieu of conventional underpinning. A method rarely used in Montreal.

Opening is planned for summer 2019.

«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16
»