Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17
»
St-Clair Under construction  |  75,000 sf
Contract delivery :
Construction Management
Located in the Wychwood neighbourhood on the corner of St. Clair Avenue West & Winona Drive, the 10-storey condo building features 80 units, three retail spaces, an outdoor patio and gym on the ground floor, and a rooftop terrace with an indoor amenity area.

There are four levels of underground parking with a total of 75 allocated parking spaces and 80 bicycle spaces. A meticulous green roof space is incorporated into the building design.

71 Redpath Under construction  |  180,000 sf
Contract delivery :
Construction Management
Located on the corner of Redpath Avenue and Soudan Avenue, this 22-storey rental tower in the Mount Pleasant West area of Toronto includes a 3-storey podium, totalling 180 suites. It features state-of-the-art amenities, ranging from a rooftop party room, pool, terraces, a large fourth floor fitness center, guest suite, private dining room, and a business lounge area, all on the ground floor. There are four underground levels of parking that provide a total of 144 spaces and 180 bicycle spaces.

Kingsway Under construction  |  650,000 sq.ft.
Contract delivery :
Construction Management
Featuring a total of 474 new suites, the redevelopment of these 5 low rise buildings consists of two new rental buildings, two new condo buildings, and one existing rental building. Located in the charming Kingsway Village area of Etobicoke, there is an abundance of green roof space incorporated intoeach building, 559 underground parking spaces, and 389 bicycle spaces.

The numerous buildings range from 7 to 17 storeys and include amenities such as a fitness rooms, party room, outdoor terraces, laundry room, games rooms, private dining rooms, event lounge, tech lounge, and pet spa.

The Hampstead Majestic Under construction  |  228,000 sq.ft.
Contract delivery :
Construction Management
This new luxurious rental tower is an all precast concrete building with luxury amenities, 2 underground parking levels and is slated for delivery in 2020.

Gallery sur le Canal 3 Under construction  |  260,000 sq.ft.
Contract delivery :
Construction Management
This Gallery sur le Canal third chapter will be the finishing touch of the Gallery sur le Canal three-part condo project in Griffintown, as the third and final development is being built. Comprised of 159 units and on the Lachine canal, this project’s design combines the area’s industrial heritage with modern architecture to create the perfect atmosphere for an inviting home in a flourishing community. To take advantage of the canal’s natural beauty, the rooftop amenities offer a breath-taking view of the water, enhancing the terrace experience is a swimming pool and a common area ideal for relaxing after a long day. Its proximity to the canal also offers a pedestrian walking trail and other outdoor activity options such as cycling, roller-blading and canoe-kayaking. Gallery sur le Canal 3 recognizes how to maximize the Lachine experience and makes it its primary focus.

Simons 2019  |  580,000 sf
Contract delivery :
Fixed Price
The construction of Simons new 40' high distribution facility in Quebec City started in May 2018. It includes 470,000 s.f. of warehouse, 47 shipping and receiving doors along with an attached 110,000 s.f. office facility.
Bronte Village Under construction  |  862,000 sq.ft.
Contract delivery :
Construction Management
Located in picturesque South Oakville, the redevelopment of the existing 1970’s era Bronte Village Mall will include the construction of two new modern residential towers that will contain 481 luxurious suites with 614 underground spaces and will also include the addition of 15,000 square feet of retail space. The suites will range from 700 square feet to over 1200 square feet and will be equipped with high end finishes and appliances. Additionally the buildings will be fully equipped with amenities including a pool, roof-top patio and lounge, party room, and a fitness room. Developed by Crombie REIT and Prince Development, this revitalization will hold true to the current aesthetic and culture of the Bronte neighbourhood and will bring an attractive and exciting renewal to the area.

Evolo X 2019  |  335,000 sf
Contract delivery :
Construction Management
Evolo X is the largest and most luxurious building to be constructed on Ile-des-Soeur’s Pointe Nord. With 40 floors and 9’-0” ceilings offered as the standard, in addition to amenity spaces such as cinema rooms, indoor and outdoor pools, the building rounds off the Evolo projects as the jewel of the development. Living spaces range from 600 sf to 4,000 sf including lavish penthouses at the upper floors.
Ogilvy - Holt Renfrew Under construction  |  217,000 sf
Contract delivery :
Construction Management
The complete renovation and transformation of the existing 217,000 square foot Ogilvy Store as well as an expansion of 40,000 sf of retail space in the new Quadrilatère de la Montagne building started in the fall of 2017. A unique feature of this project is the articulated storefront and canopy at the new public entrance, on Ave. de la Montagne. This project, once completed, will become the flagship store for the Holt Renfrew banner.
Tour des Canadiens 3 Under construction  |  685,000 s.f.
Contract delivery :
Construction Management
The third phase of the famed residential Tour des Canadiens project, located just south of the Bell Center, includes an all-glass 54 storey, 528,000 sq.ft. above grade tower featuring 565 residential units. The building’s amenities of this $150M project encompasses multiple party rooms, retail stores, a gym, a game room, an indoor pool, a lounge, a spa and outdoor terraces, and an indoor rooftop skylounge. The landscape components include not one, but two parks adjacent to the tower – including a unique urban design for a pocket park with water features on north and south sides.

«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17
»