Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15
»
Majestic Under contruction  |  228,096 sf
Contract delivery :
This new luxurious rental tower is an all precast concrete building with luxury amenities, 2 underground parking levels and is slated for delivery in 2020.

Canada House Under contruction  |  1,730,000 sq.ft.
Contract delivery :
Construction Management
This iconic super high-rise twin tower, Canada House, located next to the Rogers Center, and developed by Concord Pacific Group, is valued at over $400 million, includes an 82 and a 70 storey tower, totaling over 1,730,000 sf of construction, 1,397 units, luxurious amenities such as touchless car wash facilities, 6 levels of underground parking and a 12 storey podium.



Canada House's design is a tribute to all that is Canadian. Included in the façade are specifically designed lights and colored panels, that once illuminated, take the shape of the Canadian Maple Leaf. Additionally, an exterior "lake" for canoeing, echoing Canada's vast rivers, transforms into a skating rink in the winter. The suites include oversize tiled bathrooms, fully decked balconies, complete with infrared heaters, like the ones found on restaurant terraces across Canada, custom doors and frames, and Miele's newest technological achievement - ductless dryers.

Seasons Under contruction  |  926,000 sq.ft.
Contract delivery :
Construction Management
Seasons, a twin tower family oriented development in North York, developed by Concord Pacific Group, is valued at $200 million, includes a 39 and a 42 storey tower, 926,000 sf of construction, 694 suites and townhouses, and luxurious amenities such an outdoor skating rink, lush landscaping, 4 levels of underground parking and a 2 storey podium.



The Seasons project is a continuation and evolution of the Park Place development located in North York where a new destination for family living has been created. This project continues the tradition of extensive amenities as part of the project, in addition to lush green spaces, and a park area, and features 4 floors of underground parking, and a 2 floor podium. The suites include luxurious bathrooms, high-end European appliances and functional kitchens.

Simons Under construction  |  580,000 sf
Contract delivery :
Fixed Price
The construction of Simons new 40' high distribution facility in Quebec City started in May 2018. It will include 470,000 s.f. of warehouse, 47 shipping and receiving doors along with an attached 110,000 s.f. office facility.
Bronte Village Under construction  |  862,000 s.f.
Contract delivery :
Located in picturesque South Oakville, the redevelopment of the existing 1970’s era Bronte Village Mall will include the construction of two new modern residential towers that will contain 481 luxurious suites with 614 underground spaces and will also include the addition of 15,000 square feet of retail space. The suites will range from 700 square feet to over 1200 square feet and will be equipped with high end finishes and appliances. Additionally the buildings will be fully equipped with amenities including a pool, roof-top patio and lounge, party room, and a fitness room. Developed by Crombie REIT and Prince Development, this revitalization will hold true to the current aesthetic and culture of the Bronte neighbourhood and will bring an attractive and exciting renewal to the area.

Méga Parc Under construction  |  150,000 sf
Contract delivery :
Construction Management
Galeries de la Capitale is revamping its attraction park! Inspired by the steampunk universe, the new Méga Parc includes 18 rides and attractions, the longest skating path in the country, a stage with a complete sound system, a giant screen, an interactive water fountain displaying sound and light choreography and the very first hubless wheel in North America! The construction started in September 2017.





Ogilvy - Holt Renfrew Under construction  |  217,000 sf
Contract delivery :
Construction Management
The complete renovation and transformation of the existing 217,000 square foot Ogilvy Store as well as an expansion of 40,000 sf of retail space in the new Quadrilatère de la Montagne building started in the fall of 2017. A unique feature of this project is the articulated storefront and canopy at the new public entrance, on Ave. de la Montagne. This project, once completed, will become the flagship store for the Holt Renfrew banner.
Tour des Canadiens 3 Under construction  |  685,000 s.f.
Contract delivery :
Construction Management
The third phase of the famed residential Tour des Canadiens project, located just south of the Bell Center, includes an all-glass 54 storey, 528,000 sq.ft. above grade tower featuring 565 residential units. The building’s amenities of this $150M project encompasses multiple party rooms, retail stores, a gym, a game room, an indoor pool, a lounge, a spa and outdoor terraces, and an indoor rooftop skylounge. The landscape components include not one, but two parks adjacent to the tower – including a unique urban design for a pocket park with water features on north and south sides.

Audi Queensway Under construction  |  65,000 sf
Contract delivery :
Construction Management
The new Audi Queensway is a 65,000 sq.ft. dealership located at The Queensway and East Mall featuring to the new Audi identity. The dealership includes a 20,000 sq.ft. showroom, 10,000 sq.ft. used car display, and a state of the art service facility with equipment able to handle over 25 vehicles at any given time. The facility also includes a 15,000 sq.ft. basement for additional services as required. The building is equipped with an in ground filtration and recharger systems to limit the storm water discharge into the city storm water systems. A 35,000 sq.ft. green roof will be installed to also assist with storm water retention. A gorgeous landscaped patio, customer bistro and car wash are also scheduled to be installed.
Dollarama 6 Under construction  |  270,000 sf
Contract delivery :
Construction Management
270,000 sq.ft.expansion of one of Dollarama's distribution centers in TMR. The expansion involves 27 new loading docks and a 60,000 sq.ft. mezzanine. The project includes the demolition of two existing industrial buildings to make way for the new expansion.
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15
»