Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16
»
Conglom 2010  |  140,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
Only Reliance could envision the transformation of this waste site into a valuable and fuctional plot of land. The site originally contained 20' - 0" of unsuitable fill material, but Reliance formulated a soil re-engineering plan that eliminated the need to import any material. Completed in 2010, this two storey LEED building totals 140,000 sf of office and warehouse space. The warehouse is approximately 30' 0" clear and includes over eight loading docks.
Sico 2010  |  203,000 sf
Contract delivery :
Fixed Price, Design Build Mechanical
This new 203,000 sf distribution center constructed for Akzo Nobel Sico was built on a fast track basis and completed in less than 5 months. The project was submitted as a candidate for LEED certification and included a TPO roof to reduce solar heat gain and nine solar wall panels used to pre-heat fresh air for the warehouse. Shipping areas included 29 dock-level doors including hydraulic levelers and one drive-in door.
Bell Canada Head Office 2009  |  1,850,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
This project is the Corporate Headquarters for Canada's national phone carrier. Reliance's mandate began prior to the selection of the consulting engineers, with Reliance acting as master team leader and design-builder. All budgeting, scoping and value engineering was performed by Reliance prior to the completion of design drawings. Initially, Reliance's mandate included the construction of 1,200,000 square feet of gross constructed area of building and a tenant fit up of 570,000 square feet, to be completed within an 18 month fast-track schedule. In August of 2007, Reliance's mandate was increased to include Phase II, consisting of an additional 440,000 square feet of gross constructed area, containing 200,000 square feet of below grade parking and 240,000 square feet of additional finished space above grade. The project was designed as a LEED certified (Leadership in Environmental and Energy Design) campus site for 4,600 employees, comprising three architectural precast/curtain wall office buildings of 4, 5 and 8 storeys all interconnected by glazed atriums for Phase I, and two precast/curtain wall buildings of 5 and 3 storeys interconnected by an atrium for Phase II. The ground floors are designed to include retail spaces replicating a city core environment surrounded by a fully landscaped interior courtyard of 200,000 square feet complete with walking paths and an outdoor amphitheater. The complex also includes a 2 storey cafeteria for phase I and a 9,000 square foot cafeteria for Phase II, a gym and spa, a day care center, 3 atriums of 3 and 4 storeys, 27 elevators, 20,000 square feet of state of the art conference and training center space, high level security systems and an elaborate automated temperature and environmental control system. Parking for 2,150 cars, totaling 800,000 square feet, is constructed underneath the entire campus.
Lexus 2009  |  18,000 sf
Contract delivery :
Renovation and extension of a Lexus dealership in Ste. Julie, Quebec. The project included taking down interior and exterior walls to accommodate a new showroom, added wash bays and service bays, as well as an extended mezzanine. Work was completed on budget and ahead of schedule.
Child Psychiatry Facility at the Jewish General Hospital 2009  |  33,000 sf
Contract delivery :
Construction Management
This new 3-storey building of 33,000 square feet was designed for child psychiatric hospital patient services including areas such as classrooms, consultation rooms, a gymnasium and an exterior playground. Reliance acted as the electrical and mechanical design-builder, taking responsibility for the design of sprinklers, HVAC and plumbing systems. The hospital`s energy management goals were met by using an innovative and efficient energy design, including the use of geothermal wells.

North Cargo Village 2009  |  330,000 sf
Contract delivery :
Construction Management
This 8 month long, $35M turn-key project was constructed for the developer Aeroterm to house air cargo tenants such as Air Canada, Mercury, and Schenker. The project consists of 2 buildings, sitting on approximately 1,000,000 sf of land, with exterior envelopes consisting of precast concrete, curtain wall and prefabricated insulated metal panels. The careful selection of materials for the exterior wall was primarily based on the period during the year in which the work was to be executed. The sitework included large parking areas, loading docks and roads circulating on the air side to transport cargo to and from aircraft. Over 60,000 sf of administrative areas were fit up for tenants to manage the cargo, including special provisions for conveyors, scales, specialized equipment and cold rooms.

90 George St. 2009  |  330,000 sf
Contract delivery :
Fixed Price
This new 330,000 square foot 26-storey downtown high-rise luxury condominium development in Ottawa, Ontario, Canada consists of 104 luxury condo units, including 4 penthouses, three floors of commercial / retail and 4 storeys of underground parking. All units include hardwood floors, 4 pipe fan coil units, custom hardwood kitchens with granite countertops and high end plumbing fixtures.
Velan 1995, 1999, 2009  |  225,000 sf
Contract delivery :
Originally built in 1995, this valve production facility, fit with overhead and jib crane installations, was expanded in 1999 and more recently in 2009. The 2009 extension was a 50,000 sf added on to the existing warehouse and included construction of a new adjoining fabrication plant. It includes offices on 2 floors totaling 20,000 sf. The specifications of the specialized production areas required unique installations in electrical, HVAC and fire protection, which were all incorporated into the design and final product.
Rona 1998 - 2010  |  16 stores ea. between 25,000 and 160,000 sf
Contract delivery :
Construction Management, Fixed Price
Reliance has completed sixteen Rona home renovation stores, with full service parking areas, provisions for heavily loaded floors and enclosed lumber yards. Stores average 130,000 sf. In 2007 Reliance beat the Rona record for having completed a 100,000 sf store in a record of 84 days.
Dollarama 4 - Head Office 2008  |  428,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
Dollarama's new three storey head office, built in 2008, includes 428,000 square feet of constructed area consisting of a 28’-0” clear, 326,000 square foot warehouse, a 72,000 square foot head office and a 30,000 square foot underground parking garage. The offices and underground parking are all designed with an innovative energy design in mind, complete with a Hydronic Hybrid Heat Pump (HHHP) system, utilizing geothermal wells supplemented by a cooling tower to generate condenser water for heat pumps.
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16
»