Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»
Club Marin III 2000  |  350,000 sf
Contract delivery :
Fixed Price
This 24 storey complex is a $18,600,000 development that consists of a sports complex, underground parking and main lobby. Reliance's responsibilities included the core and shell of the building including all mechanical systems. The work was completed in 18 months, within budget and ahead of schedule.
Fairmont Mont Tremblant 1997  |  350,000 sf
Contract delivery :
The center of the largest and most popular ski resort in Eastern North America, Chateau Mont Tremblant is a $35,000,000 development located at the edge of Mont Tremblant Park in Quebec’s Laurentian Mountains. Currently owned and managed by Fairmont Hotels, it includes a four-star, 317-room hotel, a shopping promenade, sports complex and a 40,000 square foot conference centre: all built by Reliance. The work was completed in just thirteen months, on schedule and within budget.
University of Montreal Teaching Facility 1990  |  350,000 sf
Contract delivery :
Masonry and glass multi-function teaching facility for the University of Montreal. Building includes classrooms, lounges and laboratories.
Jardins De La Savane Under construction  |  350,000 sq.ft.
Contract delivery :
Jardins De La Savane, designed by Architexgroup,is a new residential appartement project situated just off the corner of rue De La Savane and Décarie boulevard. Totaling nearly 350,000 sq.ft., the project will consist of 2 towers, rising 11 and 12 storeys above ground, connected by a 5-storey podium. The building façades will expertly combine a mix of masonry, precast concrete panels, curtain wall, and metal siding, offering a distinctive yet timeless look. Once completed, the project will house 268 rental units, 2 commercial spaces, and a host of modern amenities, including a fitness center, an event hall, and 5th floor exterior pool. The underground features 1 level of parking resting on 585 foundation piles and is designed with the capacity to have electric charging stations at all parking spots as the need arises. With it's focus on balancing elegance and functional design, Jardins De La Savane will stand out amongst its neighbors in the on-going revitalisation of Montreal's midtown region.
Central Parc Laval R1 2019  |  352,000 sq.ft.
Contract delivery :
Construction Management
22-storey apartment project featuring 198 high-end rental units. Located near Carrefour Laval, this building is planned to be part of 6 building multi-use residential complex including a large private park, commercial units and a hotel. The building features two-storeys of underground parking, a rooftop pool and a gym with a scenic view and panoramic windows at the top floor. Due to new zoning regulations and restrictions, Central Parc Laval R1, R2 and C1 will be the last buildings allowed in Laval above 15 storeys.

Public Works and Government Services Canada 2003  |  364,000 sf
Contract delivery :
Design Build, Fixed Price
A 10 storey office building totaling 364,000 SF of gross constructed area built on a design-build basis for Alexis Nihon Group including the tenant fit-up work for the Canadian Government Department of Public Works. The building includes 7 elevators and a precast/glass façade and features energy consumption that is 45% less than the Model National Energy Code for Buildings. In March 2003, the building was selected as a candidate for the Canadian Design Build Institute’s Annual Design-build competition.
The Peterson 2017  |  367,000 sf
Contract delivery :
Construction Management
Architecturally inspired by the area in which it is located - Montreal's "Quartier des Spectacles" district - this 35 storey, 284 unit "festive" building's theme is clearly evident in its design. The project includes 18'-6" high ceiling lofts and 16' windows on the first 5 floors, a rock climbing wall, and a sky-terrace on the 28th floor for concert viewing and barbecuing. The units feature modern finishes, European appliances and efficient kitchens.

MYX Condos 2021  |  378,000 sq.ft.
Contract delivery :
Construction Management
MYX condos, the next installment in a mix of condos, lofts and townhouses that includes Evolo X, Evolo S, Evolo 2, Evolo 1, Pavillon Evolo and ZUNI, located on the Pointe-Nord in Nun’s Island includes 378,000 sq.ft. of gross constructed area and is scheduled to start in the fall of 2018. The project consists of 196 units over 8 storeys and will feature a rooftop pool and chalet complete with kitchen, fireplace, communal table, indoor and outdoor lounges, and a state of the art rooftop gym. Additionally, the commercial ground floor will feature outdoor covered parking for commercial clients.
Dollarama 4 - Head Office 2008  |  428,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
Dollarama's three storey head office, built in 2008, includes 428,000 square feet of constructed area consisting of a 28’-0” clear, 326,000 square foot warehouse, a 72,000 square foot head office and a 30,000 square foot underground parking garage. The offices and underground parking are all designed with an innovative energy design in mind, complete with a Hydronic Hybrid Heat Pump (HHHP) system, utilizing geothermal wells supplemented by a cooling tower to generate condenser water for heat pumps.
Evolo 2 2014  |  450,000 sf
Contract delivery :
Construction Management
Located on the shores of the St. Lawrence River and surrounded by greenery, Evolo2 is an elegant 34-storey tower offering breathtaking views of the river. These condos developed by Proment, range from 690 to 1,390 sq. ft. with larger penthouses on the upper levels.
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»