Honda 2002  |  11,000 sf
Contract delivery :
Fixed Price, Design Build Mechanical
This project included the demolition of an existing car showroom and reconstruction of a new facility with the renovation of the existing parts area, service department and administrative offices. Gross constructed area of 11,000 square feet.
Audi 2002  |  8,000 sf
Contract delivery :
Fixed Price, Design Build Mechanical
This design-built project included the demolition of an existing car showroom and reconstruction of a new one including the renovation of the existing parts area, service department and administrative offices. Gross constructed area is 8,000 square feet.
Volkswagen Park Avenue #1 2002  |  22,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
This project required the demolition of an existing car showroom and reconstruction of new one, including the renovation of the existing parts area, service department and administrative offices totaling 22,000 square feet.
Sofitel Hotel 2002  |  226,000 sf
Contract delivery :
Construction Management
The office building at 1155 Sherbrooke West was converted into a four star hotel operated by Sofitel, a French hotel operator of luxury hotels. The entire building's finishes and mechanical/electrical systems were stripped and discarded, leaving only the building's structure. New mechanical, electrical and life safety systems were installed to accommodate hotel room occupancy. An elaborate curtain wall skin and new extensions were added to the building to upgrade its aesthetics and provide meeting room and conference centre space. Construction also included a complete main kitchen for service to 258 rooms and 8,000 square feet of banquet facilities / meeting room space. The total square footage of the building, upon the project's completion was 226,000 square feet.
McAuslan Brewery 2002  |  41,000 sf
Contract delivery :
Design Build, Fixed Price
Work began with site decontamination in accordance with environmental laws, and extensive water treatment system for water using in brewing process. Installation of underground sedimentation tanks, piping and treatment tanks was done underground in order to allow space for large fermentation tanks sitting on a thickened reinforced slabs on grade;up to 24" in some areas.
Dubord and Rainville 2002  |  103,000 sf
Contract delivery :
Fixed Price
Head office for freezer and dry goods warehouse facility. Building included 25,000 sf of freezer space, 5,000 sf of refrigerated space, 32'-0" clear structure, interior loading docks and 9,000 sf of finished offices.
Telus 2002  |  156,000 sf
Contract delivery :
Fixed Price
Part of Liberty Industrial Park, this 156,000 square foot concrete structure, built as a head office for Telus Canada, includes a 24,000 square foot underground parking facility, a call centre, administrative offices, a full cafeteria, conference facilities and classrooms.
Ericsson 1984 - 2002  |  550,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
Over the course of 7 consecutive years, Reliance formed an integral part of the project team acting as General Contractor for Ericsson’s North American Research and Development Center. Once completed, Reliance had built over 550,000 square feet of new construction, consisting of 4 buildings and had completely renovated 250,000 square feet of existing space. Each building included separate underground parking linked by underground tunnels. All office areas were constructed to Class ‘A’ specifications and included details such an open atrium, a cafeteria with a full commercial kitchen and recreational facilities. All phases of the project were executed on a fast track basis.
Innes Center 2002  |  102,000 sf
Contract delivery :
This 102,000 square feet regional shopping center in Ottawa, Ontario, Canada, included the construction of 3 retail pavilions and full site development with shared services for big box retailers. The scope of work for this project includes widening of Innes Rd. and installation of new traffic lights.
Liberty Industrial Park 1993 - 2002  |  12 office buildings totalling 700,000 sf
Contract delivery :
Fixed Price
These twelve office buildings featuring class A office fit-ups averaging over 60,000 square feet each, were built between 1993 and 2002 for Liberty Sites Inc. Each structure’s exterior and interior design are unique and were constructed using select materials and finishes, making these facilities some of the most sought-after office space components in Montreal and a benchmark for comparison for new suburban office buildings. In addition to completion of each building’s core and shell for Liberty, Reliance successfully completed tenant fit-ups for clients such as Sony, Motorola, Simmonds, Consoltex, Bell Mobility, Rhone-Poulec Rorer, Robin Hood, Abbott Laboratories, Pitney Bowes, ABB and Medis.
«