Gallery Lofts sur le Canal 2016  |  191,000 sf
Contract delivery :
Construction Management
The first phase of this 14 storey residential building consists of 132 residential units, including areas on the ground floor reserved for commercial spaces, and 2 full underground parking garages.

Sico 2010  |  203,000 sq.ft.
Contract delivery :
Design Build Mechanical, Fixed Price
This new 203,000 sf distribution center constructed for Akzo Nobel Sico was built on a fast track basis and completed in less than 5 months. The project was submitted as a candidate for LEED certification and included a TPO roof to reduce solar heat gain and nine solar wall panels used to pre-heat fresh air for the warehouse. Shipping areas included 29 dock-level doors including hydraulic levelers and one drive-in door.
Cargo Dorval V 1997  |  205,000 sf
Contract delivery :
Construction Management
A 205,000 sf multi-tenant cargo warehouse facility constructed at Montreal'sPierreTrudeau Internationalairport for air freight carriers. Designed, built and made fully functional in less than 8 months. The facilty was built in "fast track" mode in order to replace the existing facility at Montreal's Mirabel Airport, which was relocated to Dorval.
Canadawide - Phase 2 2013  |  210,000 sf
Contract delivery :
Design Build, Fixed Price
A 210,000 sf expansion of a refrigerated warehouse and addition of a new head office facility for Canadawide Fruits, the largest fruit and vegetable wholesaler in Canada. The project includes construction of 60,000 square feet of office space, and an indoor underground parking garage with 165 parking spots, including 33 spots for customers’ trucks and vans. 26 overhead doors were installed for deliveries and customer pick-ups. Adjacent to the warehouse is a refrigerated showroom with 20' ceilings and a two-storey atrium. A floating 500 psf live load capacity slab was built for the entire warehouse and showroom area in order to insulate the refrigerated sections properly. It is a concrete and steel structure with exterior brick and curtain wall facades.
Ogilvy - Holt Renfrew 2019  |  217,000 sf
Contract delivery :
Construction Management
The complete renovation and transformation of the existing 217,000 square foot Ogilvy Store as well as an expansion of 40,000 sf of retail space in the new Quadrilatère de la Montagne building started in the fall of 2017. A unique feature of this project is the articulated storefront and canopy at the new public entrance, on Ave. de la Montagne. This project became the flagship store for the Holt Renfrew banner.
Velan 1995, 1999, 2009  |  225,000 sf
Contract delivery :
Originally built in 1995, this valve production facility, fit with overhead and jib crane installations, was expanded in 1999 and more recently in 2009. The 2009 extension was a 50,000 sf added on to the existing warehouse and included construction of a new adjoining fabrication plant. It includes offices on 2 floors totaling 20,000 sf. The specifications of the specialized production areas required unique installations in electrical, HVAC and fire protection, which were all incorporated into the design and final product.
Jarvis St. Residences 2018  |  200,000 sf
Contract delivery :
Construction Management
This new modern student residence in downtown Toronto features 194,000 sq.ft of student accommodation and at-grade retail, in a 30-storey building offering a mix of two, three and four bedroom units to house a total of 593 students. The two-storey podium offers a mix of amenity services to enhance the student experience. In addition, “Pod Lounges” located every third floor are designed to provide congregation space for smaller student gatherings, as well as provide a unique design expression to the building’s main façade.

Sofitel Hotel 2002  |  226,000 sf
Contract delivery :
Construction Management
The office building at 1155 Sherbrooke West was converted into a four star hotel operated by Sofitel, a French hotel operator of luxury hotels. The entire building's finishes and mechanical/electrical systems were stripped and discarded, leaving only the building's structure. New mechanical, electrical and life safety systems were installed to accommodate hotel room occupancy. An elaborate curtain wall skin and new extensions were added to the building to upgrade its aesthetics and provide meeting room and conference centre space. Construction also included a complete main kitchen for service to 258 rooms and 8,000 square feet of banquet facilities / meeting room space. The total square footage of the building, upon the project's completion was 226,000 square feet.
The Hampstead Majestic 2021  |  228,000 sq.ft.
Contract delivery :
Construction Management
This new luxurious rental tower is an all precast concrete building with luxury amenities, and 2 underground parking levels.

Rio-Can Center 2002  |  230,000 sf
Contract delivery :
Construction Management, Design Build
Construction of a new 230,000 sf multi-retail shopping facility spread over 5 pavilions including full site construction. Full site services were extended to three restaurant pavillions, and tenant fit-up of Winners and Business Depot were completed.
«