The Brick Montreal Distribution Center 2003  |  332,000 sf
Contract delivery :
Construction Management, Design Build
New distribution center of 332,000 square feet for The Brick retail store chain was built to satisfy its current needs in eastern Canada. This building serves as phase I of its eastern Canada expansion plan, allowing for an additional expansion of warehouse space of 195,000 square feet. The warehouse space is fully air-conditioned, with 40'-0"clear racking height, and superflat floor slabs of Fmin 65 for an electronic wire guide racking storage system. The 10,000 square foot regional office and customer service pick-up area form the balance of the building.
Canada Post Downtown Montreal Distribution Center 2003  |  86,000 sf
Contract delivery :
Fixed Price
New 86,000 square foot mail sorting facility, handling all of downtown Montreal’s mail, built for Canada Post, Canada’s national mail carrier.
Marché de l'Ouest 2003
Contract delivery :
Fixed Price
Construction of a canopy to existing complex in order to accomodate agricultural/food exterior market.
Park Avenue BMW 2002  |  26,000 sf
Contract delivery :
Fixed Price, Design Build Mechanical
This 26,000 square foot dealership includes a showroom with all glass curtain wall, administration areas and service and wash bay facilities. The garage includes underfloor exhaust and drainage systems.
Decarie Motors 2002  |  45,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
This design-built project was a transformation and renovation of an existing funeral parlor into a high-end vehicle showroom including administrative offices, service bays, wash bays, and 16,000 square feet of underground parking. Underground construction work required the removal of 300'-0'' of load bearing walls and underpinning of the lower existing basement. Gross constructed area was 45,000 square feet.
Honda 2002  |  11,000 sf
Contract delivery :
Fixed Price, Design Build Mechanical
This project included the demolition of an existing car showroom and reconstruction of a new facility with the renovation of the existing parts area, service department and administrative offices. Gross constructed area of 11,000 square feet.
Audi 2002  |  8,000 sf
Contract delivery :
Fixed Price, Design Build Mechanical
This design-built project included the demolition of an existing car showroom and reconstruction of a new one including the renovation of the existing parts area, service department and administrative offices. Gross constructed area is 8,000 square feet.
Volkswagen Park Avenue #1 2002  |  22,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
This project required the demolition of an existing car showroom and reconstruction of new one, including the renovation of the existing parts area, service department and administrative offices totaling 22,000 square feet.
Sofitel Hotel 2002  |  226,000 sf
Contract delivery :
Construction Management
The office building at 1155 Sherbrooke West was converted into a four star hotel operated by Sofitel, a French hotel operator of luxury hotels. The entire building's finishes and mechanical/electrical systems were stripped and discarded, leaving only the building's structure. New mechanical, electrical and life safety systems were installed to accommodate hotel room occupancy. An elaborate curtain wall skin and new extensions were added to the building to upgrade its aesthetics and provide meeting room and conference centre space. Construction also included a complete main kitchen for service to 258 rooms and 8,000 square feet of banquet facilities / meeting room space. The total square footage of the building, upon the project's completion was 226,000 square feet.
McAuslan Brewery 2002  |  41,000 sf
Contract delivery :
Design Build, Fixed Price
Work began with site decontamination in accordance with environmental laws, and extensive water treatment system for water using in brewing process. Installation of underground sedimentation tanks, piping and treatment tanks was done underground in order to allow space for large fermentation tanks sitting on a thickened reinforced slabs on grade;up to 24" in some areas.
«