Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»
Rona 1998 - 2010  |  16 stores ea. between 25,000 and 160,000 sf
Contract delivery :
Construction Management, Fixed Price
Reliance has completed sixteen Rona home renovation stores, with full service parking areas, provisions for heavily loaded floors and enclosed lumber yards. Stores average 130,000 sf. In 2007 Reliance beat the Rona record for having completed a 100,000 sf store in a record of 84 days.
75 Slater Under construction  |  160,000 sq.ft.
Contract delivery :
Construction Management
The 75 Slater project is a 25 storey condominium tower being built in the business district of the Ottawa downtown core. The project consists of 194 suites, and a 2 floor underground parking garage. With a mixture of window wall and a precast envelope, the building spans over 159,862 square feet. The upper floor features a beautiful terrace that overlooks the downtown façade. Amenities include items such as bowling lanes and a dining room.
Paris Star Lofts 2005  |  175,000 sf
Contract delivery :
Construction Management
This 6 storey, 84 unit condo conversion from a former dye factory in Montreal's Plateau Mont-Royal district included the complete stripping ofthe building to its bare structure fora new facade of precast, balconies, brick and floor to ceiling windows. The "loft" unit concept includes european kitchens, 12'-0" exposed concrete ceilings, and high end finishes.
Tommy Hilfiger 2007  |  180,000 sf
Contract delivery :
Fixed Price
New Canadian headquarters for Tommy Hilfiger which includes high end offices of 45,000 square feet on 3 floors, a full working cafeteria, showrooms, an ornate lobby,135,000 square foot of 32'-6" clear warehouse and a 15,000 square foot private underground parking garage. The exterior front façades are composed of architectural concrete with exposed white aggregate panels and energy efficient glazed curtainwall sections.
71 Redpath 2024  |  180,000 sq.ft.
Contract delivery :
Construction Management
Located on the corner of Redpath Avenue and Soudan Avenue, this 22-storey rental tower in the Mount Pleasant West area of Toronto includes a 3-storey podium, totalling 180 suites. It features state-of-the-art amenities, ranging from a rooftop party room, pool, terraces, a large fourth floor fitness center, guest suite, private dining room, and a business lounge area, all on the ground floor. There are four underground levels of parking that provide a total of 144 spaces and 180 bicycle spaces.

201 Rideau Under construction  |  183,000 sq.ft.
Contract delivery :
Construction Management
The 201 Rideau building is located in the historic Ottawa Market district. This facility is a 25 storey, 183,031 square feet building with both hotel and residential units, and 4 floors underground parking. The AC Marriott will occupy the first 17 floors consisting of 208 suites with amenities such as pool, lounge, restaurant and conference rooms. The residential suites consist of the top 8 floors totaling 95 residential suites and independent elevators from parking to the residential suites.
2100 Rememberance 2023  |  185,000 sq.ft.
Contract delivery :
Construction Management
2100 Remembrance, near the heart of the city center of Lachine, includes 139 units with a one floor garage below grade and 7 floors above. Additionally, the project includes fourteen 2-storey townhouses on the ground floor. The overall area of the building is 185,000 square feet.
The Appalachian 2006  |  190,000 sf
Contract delivery :
Construction Management
This 190,000 square foot multi-family, upscale, condo-hotel development is located in the ski resort of Mountain Creek, New Jersey. All units include full kitchens with granite, elegant bathrooms, gas fireplaces and balconies. The building amenities include a 24 / 7/ 365 pool and spa, heated sidewalks, fitness centre, business centre and a public hot steam/sauna.
Howmet-Cercast 1998  |  190,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
A 190,000 sf aluminum casting facility for an aerospace industry manufacturer. Tight tolerance levels of floors and stringent mechanical and electrical requirements were met to the exacting specifications of the manufacturer. Separate, specific environments were required for each of the different process departments.
Galeries de la Capitale 2018  |  190,000 sf
Contract delivery :
Construction Management
Major renovation of a 30 year mall in Quebec City, owned by Oxford Group and their partners. The renovation included a new food court area on the 2nd floor following a relocation from its original space, new entrances, new public spaces, the reconstruction of retail space in the old dining area, the replacement of escalators, new elevators, and the complete renovation of all the common spaces totalling 98,000 sq.ft.. Among other things, during the renovation of the ground floor, all the subgrade infrastructure was completely remediated for pyrite.

«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»