Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15
»
SF Marketing 2005  |  90,000 sf
Contract delivery :
Fixed Price, Design Build Mechanical
New offices, distribution center and production facility for a high end audio and sound equipment distributor. The building includes a humidity controlled warehouse area and repair room for guitar storage and repair, production areas, 20,000 square feet of finished offices and a 2 storey acoustically treated showroom for high-end speaker and amplifier demonstrations.
Dollarama 2 2004  |  260,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
Construction of two new warehouses totalling 260,000 sf utilized as a distribution center and built on fast track basis in just 3 and a half months. The warehouse has a 28' 0" clear hight and is equipped with ESFR sprinkler systems. The building is a combination of precast architectural concrete and metal siding façades.
Karmin Industries 2004  |  90,000 sf
Contract delivery :
Design Build, Fixed Price
Office and warehousing facility.
Moores Clothing 2004  |  84,500 sf
Contract delivery :
New 84,500 sf distribution center including 6,000 sf of offices and 120,000 sf of “veit” conveyor/racking system on 3 floors within the warehouse.
JAM Industries 2004  |  85,000 sf
Contract delivery :
Extension to existing distribution center, including offices, music labs and humidification controlled storage areas.
Labrador 2004  |  74,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
New 74,000 sf head office for the natural spring water company serving as corporate offices and a shipping/distribution center complete with drive-through loading docks and 32’-0” high steel structure for storage
Fly America 2002, 2003, 2004  |  3 stores 60,000-75,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
Reliance completed the first three Fly Stores (Laval, St. Laurent and St. Hubert, Quebec) in North America building on designs and concepts brought to Canada by the French furniture chain to Montreal in 2002. Each store is between 60,000 and 75,000 sf and each was completed in less than 4 months. Our role in all three of these initial North American stores included the constant coordination and assistance to the building owner and design professionals to adapt the European design to the North American market (choice of materials, design techniques and building envelope solutions).
Indalex 1995, 2000, 2004  |  295,000 sf
Contract delivery :
Fixed Price, Design Build Mechanical
Aluminum extrusion facility housing eastern Canada head offices. Originally constructed in 1995 as a 200,000 sf plant, further enlarged by 50,000 sf in 2000 and an additional 45,000 sf in 2004. The site selected for this building contained a 40'-0" wide river running through it which was excavated and backfilled during the winter months without any impact to the project schedule. The last extension in May 2004 included bases for a $2,000,000 press and underground service trenches.
Public Works and Government Services Canada 2003  |  364,000 sf
Contract delivery :
Design Build, Fixed Price
A 10 storey office building totaling 364,000 SF of gross constructed area built on a design-build basis for Alexis Nihon Group including the tenant fit-up work for the Canadian Government Department of Public Works. The building includes 7 elevators and a precast/glass façade and features energy consumption that is 45% less than the Model National Energy Code for Buildings. In March 2003, the building was selected as a candidate for the Canadian Design Build Institute’s Annual Design-build competition.
Novartis 2003  |  140,000 sf
Contract delivery :
Fixed Price
The new Canadian head office for Novartis Pharmaceuticals, features 140,000 square feet of finished office space including a state of the art, independently constructed basement computer room complete with a FM-200 system and stand-alone Liebert units, a cafeteria including a full commercial kitchen, fitness center and a modern conference and training center.
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15
»