Projects | All projects
Sort by:year square footage
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»
Marche Central 2023  |  1,000,000 sq.ft.
Contract delivery :
Construction Management
Construction of a new commercial retail center of approximately 1,000,000 square feet, including major civil works and urban spaces beginning construction in fall 2021. The first phase consists of the construction of a 210,000 square foot commercial building, for two (2) new retail stores, complete with a 180,000 square foot greenhouse above the retail area. Project delivery is scheduled for the fall 2022.
Symphonia VIU 2024  |  550,000 sq.ft
Contract delivery :
Construction Management
Construction of the phase 2A project comprising 46 floors including 2 floors of underground parking. The podium and garage total 68,000 square feet and each typical floor of the tower will be 9,000 square feet. The curtain wall envelope, the interior finishes of the condos including high-end engineering flooring, Miele and Bosch appliances, and Eruopean style doors, as well as the common areas including an interior pool, a sauna and a gym, all highlight the high-end status of this project.
Browns Under construction  |  38,000 sq.ft.
Contract delivery :
Expansion of the Browns Shoes warehouse of ??38,000 sq.ft. with a clear height of 40’. 3 unloading docks and 1 drive-in door are added to the existing building and the floors will offer a level of flatness of FF45 in order to accommodate storage at height. The project requires 65 new wheelbases in the warehouse in order to accommodate new mezzanines on 2 new floors for storage and the development of new offices.
75 Slater Under construction  |  160,000 sq.ft.
Contract delivery :
Construction Management
The 75 Slater project is a 25 storey condominium tower being built in the business district of the Ottawa downtown core. The project consists of 194 suites, and a 2 floor underground parking garage. With a mixture of window wall and a precast envelope, the building spans over 159,862 square feet. The upper floor features a beautiful terrace that overlooks the downtown façade. Amenities include items such as bowling lanes and a dining room.



1354 Carling Under construction  |  291,000 sq.ft.
Contract delivery :
Being built for Holloway Lodging Limited Partnership, this project consists of two phases with phase one including 2 residential towers located right at the intersection of Carling and Queensway 417. The envelop consists of masonry brick, precast panels, curtain walls, punched windows and window walls as well as splendid glazed guardrails on the balconies on the terraces.

The first tower boasts 20 storey, 201,000 sq. ft., 272 units, with 2 parking levels and the second tower is an 8 storey, 90,000 sq. ft., 132 units with 1 parking level. The construction work of phase 1 is scheduled to end by January 2024.

Kingsway Under construction  |  650,000 sq.ft.
Contract delivery :
Construction Management
Featuring a total of 474 new suites, the redevelopment of these 5 low rise buildings consists of two new rental buildings, two new condo buildings, and one existing rental building. Located in the charming Kingsway Village area of Etobicoke, there is an abundance of green roof space incorporated into each building, 559 underground parking spaces, and 389 bicycle spaces.

The numerous buildings range from 7 to 17 storeys and include amenities such as a fitness room, party room, outdoor terraces, laundry room, games rooms, private dining rooms, event lounge, tech lounge, and pet spa.

201 Rideau Under construction  |  183,000 sq.ft.
Contract delivery :
Construction Management
The 201 Rideau building is located in the historic Ottawa Market district. This facility is a 25 storey, 183,031 square feet building with both hotel and residential units, and 4 floors underground parking. The AC Marriott will occupy the first 17 floors consisting of 208 suites with amenities such as pool, lounge, restaurant and conference rooms. The residential suites consist of the top 8 floors totaling 95 residential suites and independent elevators from parking to the residential suites.
625 Sheppard Under construction  |  1 sf
Contract delivery :
Located in the heart of Bayview Village Canderel in joint venture with Haven are developing a state-of-the-art condo community. Located minutes’ walk away from Bayview Village Mall and TTC station this 10 storey 226 unit tower plus 12 townhouse units will be one of a kind. The build envelope will consist of precast, window wall, punch window system and metal cladding. The stunning balconies and terraces will boast breathtaking unobstructed views of the city skyline through the glazed guardrails.The tower will have 2 levels of underground parking with 418 square meters of retail space located on the ground floor. With a total of 16,240 square feet of residential living area 625 Sheppard will also have amenities including gym, party rooms, BBQ terraces and green roof. Construction will be complete March 2024.
71 Redpath Under construction  |  180,000 sq.ft.
Contract delivery :
Construction Management
Located on the corner of Redpath Avenue and Soudan Avenue, this 22-storey rental tower in the Mount Pleasant West area of Toronto includes a 3-storey podium, totalling 180 suites. It features state-of-the-art amenities, ranging from a rooftop party room, pool, terraces, a large fourth floor fitness center, guest suite, private dining room, and a business lounge area, all on the ground floor. There are four underground levels of parking that provide a total of 144 spaces and 180 bicycle spaces.

435 René-Lévesque Under construction  |  1 sf
Contract delivery :
Construction Management
Located in the heart of Montreal's entertainment district in the downtown area, 455 Rene-Levesque will consist of two impressive residential towers, the first composed of 36 floors and the second 45 floors, with a total of 820 rental units. The project will achieve a dual design by being in harmony with one of Montreal's oldest Church to its north, while still matching with the modern downtown atmosphere with its glass design and slightly tilted architecture. The building's surroundings will include the Quartier des Spectacles, two metro stations, and bus and train stations. These two buildings will become important Montreal landmarks, and will be joining the rest of the sky scrapers in the downtown core which have helped shape the beauty and splendor of the city.
«
1 - 2 - 3 - 4 - 5 - 6 - 7 - 8 - 9 - 10 - 11 - 12 - 13 - 14 - 15 - 16 - 17 - 18 - 19
»