Projects | Industrial Buildings

We build warehouses, distribution centers, cold storage facilities, transportation/logistics facilities, heavy industry factories and foundries for a variety of industrial clients, ranging from manufacturers of consumer products through to metals recyclers. The volume of industrial construction we do – amounting to some two hundred buildings over the past decade and generating over two million square feet of new industrial space every year – places Reliance among the top contractors in North America in this market.

Recently, given the scarcity of new land in developing metropolises and the constant increasing volume of imports from the far east, the redevelopment and modernization of existing industrial facilities and brown sites to today’s marketable standards, has become a niche market in which we have excelled.

Sort by:year square footage
«
1 - 2 - 3 - 4 - 5
»
Sico 2010  |  203,000 sq.ft.
Contract delivery :
Design Build Mechanical, Fixed Price
This new 203,000 sf distribution center constructed for Akzo Nobel Sico was built on a fast track basis and completed in less than 5 months. The project was submitted as a candidate for LEED certification and included a TPO roof to reduce solar heat gain and nine solar wall panels used to pre-heat fresh air for the warehouse. Shipping areas included 29 dock-level doors including hydraulic levelers and one drive-in door.
Conglom 2010  |  140,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
Only Reliance could envision the transformation of this waste site into a valuable and fuctional plot of land. The site originally contained 20' - 0" of unsuitable fill material, but Reliance formulated a soil re-engineering plan that eliminated the need to import any material. Completed in 2010, this two storey LEED building totals 140,000 sf of office and warehouse space. The warehouse is approximately 30' 0" clear and includes over eight loading docks.
Velan 1995, 1999, 2009  |  225,000 sf
Contract delivery :
Originally built in 1995, this valve production facility, fit with overhead and jib crane installations, was expanded in 1999 and more recently in 2009. The 2009 extension was a 50,000 sf added on to the existing warehouse and included construction of a new adjoining fabrication plant. It includes offices on 2 floors totaling 20,000 sf. The specifications of the specialized production areas required unique installations in electrical, HVAC and fire protection, which were all incorporated into the design and final product.
North Cargo Village 2009  |  330,000 sq.ft.
Contract delivery :
Construction Management
This 8 month long, $35M turn-key project was constructed for the developer Aeroterm to house air cargo tenants such as Air Canada, Mercury, and Schenker. The project consists of 2 buildings, sitting on approximately 1,000,000 sf of land, with exterior envelopes consisting of precast concrete, curtain wall and prefabricated insulated metal panels. The careful selection of materials for the exterior wall was primarily based on the period during the year in which the work was to be executed. The sitework included large parking areas, loading docks and roads circulating on the air side to transport cargo to and from aircraft. Over 60,000 sf of administrative areas were fit up for tenants to manage the cargo, including special provisions for conveyors, scales, specialized equipment and cold rooms.

Dollarama 4 - Head Office 2008  |  428,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
Dollarama's three storey head office, built in 2008, includes 428,000 square feet of constructed area consisting of a 28’-0” clear, 326,000 square foot warehouse, a 72,000 square foot head office and a 30,000 square foot underground parking garage. The offices and underground parking are all designed with an innovative energy design in mind, complete with a Hydronic Hybrid Heat Pump (HHHP) system, utilizing geothermal wells supplemented by a cooling tower to generate condenser water for heat pumps.
19700 Clark Graham 2008  |  125,000 sq.ft
Contract delivery :
Design Build, Fixed Price
Construction of a two storey industrial facility including 13,000 sf of office space and 112,000 sf of 32' 0" clear warehouse space. Project was built for the possibility of a future expansion of 149,000 sf. The building includes 12 loading docks and one garage door as well as a slab on grade capable of supporting heavy loads. The building is equipped with ESFR sprinkler system and is built with access to railroad.
Tyco 2007  |  121,000 sf
Contract delivery :
Design Build, Fixed Price
Warehouse built with 32'-0" clear structure, including 15 hydraulic loading docks, one drive-in dock and one compactor door. Also included in the building is 7,200 SF of office and the possibility of accomodating a second floor.
Tommy Hilfiger 2007  |  180,000 sf
Contract delivery :
Fixed Price
New Canadian headquarters for Tommy Hilfiger which includes high end offices of 45,000 square feet on 3 floors, a full working cafeteria, showrooms, an ornate lobby,135,000 square foot of 32'-6" clear warehouse and a 15,000 square foot private underground parking garage. The exterior front façades are composed of architectural concrete with exposed white aggregate panels and energy efficient glazed curtainwall sections.
Dollarama 3 2006  |  330,500 sf
Contract delivery :
Construction Management, Design Build Mechanical
Expansion of 130,500 SF of warehouse to an existing building of 200,000 SF which was completely stripped and renovated. Total square footage after expansion is 330,500 SF.
SF Marketing 2005  |  90,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
New offices, distribution center and production facility for a high end audio and sound equipment distributor. The building includes a humidity controlled warehouse area and repair room for guitar storage and repair, production areas, 20,000 square feet of finished offices and a 2 storey acoustically treated showroom for high-end speaker and amplifier demonstrations.
«
1 - 2 - 3 - 4 - 5
»