Projects | Hospitality and Residential

Our diverse experience in this field began in the 1980’s as the international tourist and business boom gave rise to demand for independent high end hotels complete with business conference centers, banquet halls, restaurants and shopping areas. By 2010, Reliance had completed over 750 hotel rooms and associated conference spaces. As the market evolved and baby boomers turned into empty nesters, high rise condominium construction became more common. Our vast experience in this domain ranges from affordable residential units for first-time buyers to condominium developments for seasoned buyers, complete with high-end amenities. In 2009, the Canadian housing market emerged from the recession and by 2010, Reliance had completed or had under construction over 3,000 condo units in eastern Canada.

Sort by:year square footage
«
1 - 2 - 3 - 4 - 5
»
Forest Hill 2012  |  127,000 sf
Contract delivery :
Fixed Price
This nine storey, 75 unit condominium is located at the base of Mount Royal. Each unit includes a european style kitchen and hardwood floors. The building is equipped with underground parking and lavish landscaping.
Onyx 2014  |  112,000 sf
Contract delivery :
Construction Management
ONYX is a modern designed building including multi-colored exterior cladding in brick, steel panels and glass. In addition, this project contains several 2 storey penthouses, European style appliances, quartz countertops and avant-garde plumbing fixtures.
Evolo Pavillion 2013  |  80,000 sf
Contract delivery :
Construction Management
Pavillon C is the first waterfront mid-rise building on Pointe-Nord, Nuns’ Island that offers the exclusive opportunity to live in an intimate building, on the water’s edge, nestled between the pedestrian plaza and the gardens of Evolo 2. This five-storey building, consisting of only 39 condos ranging from 665 to 1,175 sq ft, plus four exclusive penthouses with vast rooftop terraces, is a model of intelligent design. Layouts of the condos were carefully planned to maximize the value of every square foot. The ground floor includes a retail pavilion featuring trendy shops and restaurants.
St-Clair Under construction  |  75,000 sf
Contract delivery :
Construction Management
Located in the Wychwood neighbourhood on the corner of St. Clair Avenue West & Winona Drive, the 10-storey condo building features 80 units, three retail spaces, an outdoor patio and gym on the ground floor, and a rooftop terrace with an indoor amenity area.



There are four levels of underground parking with a total of 75 allocated parking spaces and 80 bicycle spaces. A meticulous green roof space is incorporated into the building design.

Lowney's Phase I 2005  |  70,000 sf
Contract delivery :
Construction Management
Conversion and restoration of the 1902 Lowney’s wood structure chocolate factory (two buildings) to accommodate a new 110 unit condo development. Phase I of the development includes 1 floor of underground parking, exposed wood beams within each unit, a rooftop terrace complete with swimming pool, and contemporary finishes.
Époques Phase 2 2005  |  63,000 sf
Contract delivery :
Construction Management
A 61 unit, 63,000 square foot condo development, undertaken for Prevel in Old Montreal, Quebec. The quaint location for the project required underpinning of two existing turn-of-the-century buildings. The development includes a rooftop terrace with a “Zen” basin. All units are complete with hardwood flooring, hardwood doors and frames, and European kitchens and appliances.
LeCour Langhorne 2018  |  61,000 sf
Contract delivery :
Construction Management
Luxurious 3 storey townhouses located in the upscale neighbourhood of Hampstead, Quebec. Including 2, 3, 4, and 5 bedrooms options, the units range from 2,580 sf to 3,120 sf with private 2 car underground garages and 9’ ceilings. The development also includes luxurious yards for each townhouse, car charging station infrastructure, and innovative energy conservation design elements. The project is developed by The Benvenuto Group and designed by NEUF Architect(e)s.


Au Village du Musée 2005  |  60,455 sf
Contract delivery :
Construction Management
A 5-storey condominium development consisting of 6,000 sf of below ground parking, upgrade lobby and 47 finished luxury condo units. Reliance was responsible for completion and fit up of all 47 units according to the individual owner's requirements, including renovation to an existing building (circa 1890) configured for 5 ultra-luxurious "historic" condo units.
2033 Clark 2014  |  28,000 sf
Contract delivery :
Construction Management
Construction of new condominium, restoring the existing historic brick facade. Originally a two storey building, two additional storeys will be added, marrying a modern facade to the historic one below. To accommodate a new underground parking garage, underpinning of the existing facade and the neighbor's properties was necessary. The building houses 22 residential units with hardwood floors and European style kitchens.
Tour des Canadiens 2 2019  |  700,000 sf
Contract delivery :
Construction Management
The second phase of the famed residential Tour des Canadiens project, located just south of the first phase, includes a 55 storey, 716,000 sq.ft. tower featuring 590 residential units. The building’s amenity spaces, conceived with Montreal’s downtown energy and vibrancy in mind, include an interior rooftop skylounge, an indoor/outdoor pool, and a wine bar and wine cellar. Additionally, the building sits on 55,000 sq.ft. of land, designed as an urban park, complete with an overhead bridge connection across St. Antoine St., connected into the Bell Centre and the Montreal Underground City.

«
1 - 2 - 3 - 4 - 5
»