Rio-Can Center 2002  |  230,000 sf
Contract delivery :
Construction Management, Design Build
Construction of a new 230,000 sf multi-retail shopping facility spread over 5 pavilions including full site construction. Full site services were extended to three restaurant pavillions, and tenant fit-up of Winners and Business Depot were completed.
Sofitel Hotel 2002  |  226,000 sf
Contract delivery :
Construction Management
The office building at 1155 Sherbrooke West was converted into a four star hotel operated by Sofitel, a French hotel operator of luxury hotels. The entire building's finishes and mechanical/electrical systems were stripped and discarded, leaving only the building's structure. New mechanical, electrical and life safety systems were installed to accommodate hotel room occupancy. An elaborate curtain wall skin and new extensions were added to the building to upgrade its aesthetics and provide meeting room and conference centre space. Construction also included a complete main kitchen for service to 258 rooms and 8,000 square feet of banquet facilities / meeting room space. The total square footage of the building, upon the project's completion was 226,000 square feet.
Telus 2002  |  156,000 sf
Contract delivery :
Fixed Price
Part of Liberty Industrial Park, this 156,000 square foot concrete structure, built as a head office for Telus Canada, includes a 24,000 square foot underground parking facility, a call centre, administrative offices, a full cafeteria, conference facilities and classrooms.
Volkswagen Park Avenue 2002  |  22,000 sf
Contract delivery :
Design Build Mechanical, Fixed Price
This project required the demolition of an existing car showroom and reconstruction of new one, including the renovation of the existing parts area, service department and administrative offices totaling 22,000 square feet.
Canada Post Downtown Montreal Distribution Center 2003  |  86,000 sf
Contract delivery :
Fixed Price
New 86,000 square foot mail sorting facility, handling all of downtown Montreal’s mail, built for Canada Post, Canada’s national mail carrier.
Marché de l'Ouest 2003  |  10,000 sq.ft
Contract delivery :
Fixed Price
Construction of a canopy to existing complex in order to accomodate agricultural/food exterior market.
Novartis 2003  |  140,000 sf
Contract delivery :
Fixed Price
The new Canadian head office for Novartis Pharmaceuticals, features 140,000 square feet of finished office space including a state of the art, independently constructed basement computer room complete with a FM-200 system and stand-alone Liebert units, a cafeteria including a full commercial kitchen, fitness center and a modern conference and training center.
Public Works and Government Services Canada 2003  |  364,000 sf
Contract delivery :
Design Build, Fixed Price
A 10 storey office building totaling 364,000 SF of gross constructed area built on a design-build basis for Alexis Nihon Group including the tenant fit-up work for the Canadian Government Department of Public Works. The building includes 7 elevators and a precast/glass façade and features energy consumption that is 45% less than the Model National Energy Code for Buildings. In March 2003, the building was selected as a candidate for the Canadian Design Build Institute’s Annual Design-build competition.
The Brick Montreal Distribution Center 2003  |  332,000 sf
Contract delivery :
Construction Management, Design Build
New distribution center of 332,000 square feet for The Brick retail store chain was built to satisfy its current needs in eastern Canada. This building serves as phase I of its eastern Canada expansion plan, allowing for an additional expansion of warehouse space of 195,000 square feet. The warehouse space is fully air-conditioned, with 40'-0"clear racking height, and superflat floor slabs of Fmin 65 for an electronic wire guide racking storage system. The 10,000 square foot regional office and customer service pick-up area form the balance of the building.
Dollarama 2 2004  |  260,000 sf
Contract delivery :
Construction Management, Design Build Mechanical
Construction of two new warehouses totalling 260,000 sf utilized as a distribution center and built on fast track basis in just 3 and a half months. The warehouse has a 28' 0" clear hight and is equipped with ESFR sprinkler systems. The building is a combination of precast architectural concrete and metal siding façades.
«